background image

5

INSTALLATION

INSTALLING THE NEW OZONE GENERATOR SUBASSEMBLY

1.  Install the new ozone generator subassembly using the screws previously removed. 

2. Mount the terminal block to the new ozone bracket using the screws previously removed.

NOTICE

 The new terminal block position is lower than previous – the unit wire harness will allow it 

to reach but it may require adjustment and/or removal of zip-ties. 

3. Connect the new ozone module power connectors (3) to any of the six available positions on the 

wire harness. 

4. Connect the new longer ozone gas line to the injector tube adapter and secure with tubing clamp. 

                      The ozone gas line contains a check valve – install so that the arrow on the check valve 

points towards the injector tube adapter.  

5. Connect the other end of the ozone gas line to the bottom of the ozone outlet manifold and secure 

with tubing clamp.

SYSTEM STARTUP

Restore power to the unit and check proper operation, including no water leaks from the ozone gas line 

and verify the ozone module lights (3) are illuminated.

Close unit door.

NOTICE

FIGURE 2: NEW OZONE GENERATOR SUBASSEMBLY

Power 

Connectors

Ozone 

Module

Ozone 

Module 

Lights

Ozone Outlet 

Manifold

Ozone Gas 

Line 

Tubing 

Clamp

Summary of Contents for DEL AOP 50

Page 1: ...4 2835 01 Rev A C M P COM DEL DEL AOP 50 OZONE UPGRADE SERVICE INSTRUCTIONS ...

Page 2: ...e before any service work is performed Failure to do so could result in serious injury or death The DEL AOP 50 must be installed in an outdoor location or indoors in a forced air ventilated room and installed so that the orientation is exactly as shown in Figure 1 Install to provide water drainage of generator to protect electrical components Mount the DEL AOP 50 so that it is inaccessible to anyo...

Page 3: ...TENTS Covered by one or more U S patents or pending patent applications See c m p com patents for details AOP 50 Preparation 4 Removing the Ozone Generator Subassembly 4 Installing the New Ozone Generator Subassembly 5 Initial System Start Up 5 ...

Page 4: ...cid may be present in the tubing Wear proper safety equipment gloves and eye protection and avoid direct contact with any condensation in the line REMOVING THE OZONE GENERATOR SUBASSEMBLY 1 Loosen tubing clamp and disconnect the ozone gas line from the injector tube adapter 2 Disconnect the ozone module power connectors 6 from the wire harness 3 Loosen the terminal block from the ozone bracket by ...

Page 5: ... wire harness 4 Connect the new longer ozone gas line to the injector tube adapter and secure with tubing clamp The ozone gas line contains a check valve install so that the arrow on the check valve points towards the injector tube adapter 5 Connect the other end of the ozone gas line to the bottom of the ozone outlet manifold and secure with tubing clamp SYSTEM STARTUP Restore power to the unit a...

Page 6: ...m Below Keep for Your Records Installer _______________________________________________________________ System Purchased From ______________________________________________ Installation Date _____________________________ Serial Number _______________________________ ...

Page 7: ...7 NOTES ...

Page 8: ...CMP LLC 36 HERRING ROAD NEWNAN GA 30265 WWW C M P COM DEL 0621AB ...

Reviews: