Clyde CKRS 05 Datasheet Download Page 4

Installation requirements

Boiler location (Refer Figs 2 & 3)

The location chosen for the boiler(s) must be frost free,
provide for a satisfactory flue system and an adequate air
supply for combustion and ventilation.  Adequate access is
necessary for boiler and burner servicing.

Boilers must not be installed in areas where flammable
vapours are likely to be present.  To avoid damage to the
boilers, contamination of the combustion air by high levels
of dust or halogenated hydrocarbons (eg. Solvents, spray
can propellants, cleaning agents, adhesives, etc) must be
avoided.

Boilers should be installed on a plinth which is at least
50mm high and is smooth and level (NB : for some burners
with acoustic shrouds the plinth may need to be higher -
refer Sales Office).

An uneven plinth can inhibit freedom for expansion and
contraction of the boiler during operation.

Burners

Boilers can be supplied with one or two stage Natural gas,
LPG, Class D or Class C oil burners.  A choice of burner
makes is available.

• •

W3

A

A

W2

W1

W4

Boiler

Fig 2 - Wall clearances

Plant room layout (Refer Fig 2)

When  planning  the  layout  of  the  boiler  room,  allowance
must  be  made  for  opening  the  boiler  door,  boiler
assembling,  boiler  cleaning  and  maintenance.    The  boiler
door may be hinged from the right (as illustrated) or the left.
A  ceiling  height  of  at  least  2.3m  is  recommended.    Wall
clearances are:

W1  - at least 700mm.
W2  - burner length A + 100mm.
W3  - 1000mm (in front of boiler for cleaning).
W4  - 500mm minimum (behind boiler for cleaning).

Plinth dimensions (Refer Fig 3)

Plinth height - at least 50mm, smooth and level.

Fig 3 - Plinth dimensions

Fuel specification

Natural gas (GCV 38.76 MJ/m

3

) with a minimum gas inlet

pressure according to the burner model specified.
BS2869 Class D oil (35 sec).  Advice should be sought
from the oil supplier regarding the storage of Class D oil.

Fuel supply pipework

Install gas or oil supply pipe(s) and service valve(s) so as
to allow free access to the boiler and full opening of the
furnace door without removing the burner from the boiler
door (see below).

Commissioning  of  the  gas  supply  pipework  and
components must be carried out by a qualified person, eg,
a  Gas  Safe  registered  engineer.    The  gas  meter  and
supply must be sited in accordance with the requirements
of BS6400.

Boiler

L1 mm

CKRS-05

880

CKRS-06

915

CKRS-07

1125

CKRS-08

1245

CKRS-09

1370

L1

650
min

EDS801/3 page4

Summary of Contents for CKRS 05

Page 1: ...tallation requirements 4 5 Boiler control wiring 6 7 Seasonal efficiency of over 84 gives compliance with ADL2B 2013 for gas fired boilers without the need for additional heating credits Compact heat...

Page 2: ...ating pressure of 6 bar and maximum temperature of 90oC CKRS boilers may be fired by Natural gas LPG Class D or Class C oil with 1 or 2 stage control The boiler is suitable for use in either open vent...

Page 3: ...cludes burner kg 289 334 381 429 474 Water volume litres 55 65 75 85 95 Flue gas mass flow 3 oxygen m h 8 4 10 4 12 3 14 2 16 2 Chimney draught Pa Gas side resistance mbar 1 65 1 82 2 05 2 3 2 55 Flue...

Page 4: ...ning the layout of the boiler room allowance must be made for opening the boiler door boiler assembling boiler cleaning and maintenance The boiler door may be hinged from the right as illustrated or t...

Page 5: ...e burner Water circulation Refer Fig 4 The flow water temperature from the boiler must reach 60 C gas firing or 50 C oil firing within 10 minutes of the boiler being brought into operation Thereafter...

Page 6: ...n Thermostat TR is a 1 stage item with CKCR1 and a dual thermostat 1 and 2 stage with CKCR2 0 I L1 L2 Fuse STB L3 L4 TR Thermometer EDS801 3 page6 Fig 6 Boiler control panel 1 2 3 4 5 6 7 8 9 10 11 12...

Page 7: ...eg timeclock L1 On off indicator lamp L2 Boiler high limit lock out lamp lamp is illuminated when running and goes out in lock out condition L3 Stage 1 run lamp L4 Stage 2 run lamp STB High limit ther...

Page 8: ...803 2 November 2014 Carnot Consult Ltd This publication is issued subject to alteration or withdrawal without notice The illustrations and specifications are not binding in detail All offers and sale...

Reviews: