Materials & boiler assembling

The  boiler  is  supplied  as  standard  with  the  cast  iron
sections assembled.  The boiler blocks can be split and
reassembled at site to special order.  Each section is tested
hydraulically for soundness  in accordance with EN303.
The insulation and steel jacket is already fitted to the boiler.
The boiler control panel and burner are packed separately
for fitting on site.

Site assembling should only be undertaken by Carnot or
their  authorised  engineer.    All  insulating  and  refractory
materials are included, with ceramic sealing ropes for all
access doors.

Handling

Offloading, dry storing and placing of equipment in the
boiler room is the responsibility of the installer.

Equipment must be dry stored and protected from frost.
Cartons must not be crushed or otherwise damaged.

Commissioning

Carnot  undertake  commissioning  of  boilers.

General information

Description

CKRS cast iron sectional boilers are designed for use in either open vented or pressurised heating systems up to 6 bar
working pressure with gas, oil or dual fuel burners.  There are five models in the range 75 kW to 145 kW.  The boiler has a
pressurised combustion chamber and matched burners offered are all capable of overcoming the boiler resistance without
the assistance of the chimney.

These are 3-pass boilers and comply with the efficiency requirements of ADL2: 2013 of The Building Regulations.

Application

CKRS boilers are made from Grade GG20 cast iron and conform with the requirements of EN 303.  The boilers are
suitable for use in LTHW heating systems with a maximum operating pressure of 6 bar and maximum temperature of
90

o

C.

CKRS boilers may be fired by Natural gas, LPG, Class D or Class C oil  with 1 or 2-stage control.

The boiler is suitable for use in either open vented or pressurised heating systems.  It is not suitable for use as a direct
water heater.  Where potable water is required, a matching calorifier or plate heat exchanger must be provided in the
system.

Statutory requirements

CKRS boilers are CE marked and must be fired by a compatible burner certified to EN267 (oil firing) or EN676 (gas firing)

to comply with the Boiler (Efficiency) Directive 1993.

The installation, assembling and commissioning of the boiler must be carried out by a qualified engineer in accordance
with the instructions provided.

Gas supplies and gas burners must be installed and commissioned by a qualified person, eg. a Gas Safe registered
engineer.

Commissioning charges do not include servicing during the
guarantee period.  This may be carried out under service
contract or to specific order.

Boiler log book

A permanent record of commissioning and servicing data
and measurements should be kept in the building log book.
It should be kept safe and updated whenever routine or
emergency work is performed on the boiler.

Guarantee

Subject to correct handling, installation and operation, all
equipment is guaranteed for twelve months from the date
of despatch.  Boiler sections are guaranteed for a period of
five years from the date of despatch.

The  guarantee  is  not  valid  if  the  boiler  is  subjected  to
thermal  stress,  becomes  blocked  with  debris  and/or
carbonate deposits from the system water and/or there is
no  documented  evidence  of  commissioning  by  a
competent engineer.

Fig 1  3-pass operation of boiler

FLOW

RETURN

Second pass

Third pass

EDS801/3 page2

Summary of Contents for CKRS 05

Page 1: ...tallation requirements 4 5 Boiler control wiring 6 7 Seasonal efficiency of over 84 gives compliance with ADL2B 2013 for gas fired boilers without the need for additional heating credits Compact heat...

Page 2: ...ating pressure of 6 bar and maximum temperature of 90oC CKRS boilers may be fired by Natural gas LPG Class D or Class C oil with 1 or 2 stage control The boiler is suitable for use in either open vent...

Page 3: ...cludes burner kg 289 334 381 429 474 Water volume litres 55 65 75 85 95 Flue gas mass flow 3 oxygen m h 8 4 10 4 12 3 14 2 16 2 Chimney draught Pa Gas side resistance mbar 1 65 1 82 2 05 2 3 2 55 Flue...

Page 4: ...ning the layout of the boiler room allowance must be made for opening the boiler door boiler assembling boiler cleaning and maintenance The boiler door may be hinged from the right as illustrated or t...

Page 5: ...e burner Water circulation Refer Fig 4 The flow water temperature from the boiler must reach 60 C gas firing or 50 C oil firing within 10 minutes of the boiler being brought into operation Thereafter...

Page 6: ...n Thermostat TR is a 1 stage item with CKCR1 and a dual thermostat 1 and 2 stage with CKCR2 0 I L1 L2 Fuse STB L3 L4 TR Thermometer EDS801 3 page6 Fig 6 Boiler control panel 1 2 3 4 5 6 7 8 9 10 11 12...

Page 7: ...eg timeclock L1 On off indicator lamp L2 Boiler high limit lock out lamp lamp is illuminated when running and goes out in lock out condition L3 Stage 1 run lamp L4 Stage 2 run lamp STB High limit ther...

Page 8: ...803 2 November 2014 Carnot Consult Ltd This publication is issued subject to alteration or withdrawal without notice The illustrations and specifications are not binding in detail All offers and sale...

Reviews: