
52
WSAN-YES 18.2-35.2
M0ST10N19-00
intervention frequency (months)
3
6
12
1
presence corrosion
X
2
panel fixing
X
3
fan fixing
X
4
coil cleaning
X
5
water filter cleaning
X
6
water: quality, pH, glycol concentration
X
7
exchanger efficiency check
X
8
circulation pump
X
9
check of the fixing and the insulation of the power lead
X
10
check of the earthing cable
X
11
electric panel cleaning
X
12
power remote controls status
X
13
termina closing, cable insulation integrity
X
14
voltage and phase unbalancing (no load and on-load)
X
15
absorptions of the single electrical loads
X
16
compressor casing heaters test
X
17
Checking for leaks*
*
18
survey of the refrigerant circuit operating parameters
X
19
safety valve*
*
20
protective device test: pressure switches, thermostats, flow switches etc..
X
21
control system test: setpoint, climatic compensations, capacity stepping, water / air flow-rate
variations
X
22
control device test: alarm signalling, thermometers, probes, pressure gauges etc..
X
* Refer to the local regulations
.
10 MAINTENANCE
Inspections frequenty
Perform an inspection every 6 months minimum.
The frequency, however, depends on the use.
In the event of frequent use it is recommended to
plan inspections at shorter intervals:
frequent use (continuous or very intermittent
use, near the operating limits, etc)
critical use (service necessary)
in highly aggressive environments such as
industrial environments with concentrations
of combustion fumes or chemical
substances
highly polluted urban environments
rural areas with concentrations of
fertilizers, livestock manure, diesel engine
exhaust gases
coastal areas