11. Tighten the twelve M12 screws on top of the OD mount that clamp the radial
leg section.
12. Repeat step 4 to check for level; repeat step 5 to step 9 as needed to finalize
leveling.
CAUTION
If you used the 10-mm hex wrench, remove it from the hex opposite the
motor. Otherwise, damage to the machine may occur.
3.8
S
URFACE
MOUNTING
See Section 3.5 on page 30 for a full list of installation hazard warnings.
3.8.1
Setup overview for the surface mount machine
To set up the FF6300 surface mount, follow the process below. For details on these
steps, see Section 3.8.2 on page 42 and Section 3.8.3 on page 43.
1. Remove the ID chuck from the FF6300 main body.
2. Secure the surface mount plate to the workpiece by either tack-welding, bolt-
ing, or clamping.
3. Secure the FF6300 main body to the surface mount plate.
4. Center and level the machine.
3.8.2
Assembling the surface mount
The surface mount attaches to the main body with the same M12 fasteners as the ID
chuck. The surface mount can be secured to the work piece first and then the machine
bolted to the mount, or the machine can be mounted as a complete unit.
The surface mount consists of two primary parts:
•
The circular mounting plate to which the machine is attached
•
The four blocks secured to the workpiece, from which the mounting plate
is centered and leveled
The four blocks can be drilled for mounting holes and clamped or tack-welded to the
workpiece or other custom fixture determined by the operator.
•
When the blocks are bolted, use a minimum of two M8 (5/16") bolts per
block.
•
When the blocks are tack-welded, use a minimum of 1" (25mm) of 1/4"
(6mm) weld per block.
Summary of Contents for FF6300
Page 2: ......
Page 4: ...Page B FF6300 Operating Manual CLIMAX GLOBAL LOCATIONS...
Page 5: ...P N 80679 Rev 10 Page C CE DOCUMENTATION...
Page 10: ...Page iv FF6300 Operating Manual This page intentionally left blank...
Page 14: ...Page viii FF6300 Operating Manual This page intentionally left blank...
Page 16: ...Page x FF6300 Operating Manual This page intentionally left blank...
Page 21: ...P N 80679 Rev 10 Page 5 This page intentionally left blank...
Page 28: ...Page 12 FF6300 Operating Manual This page intentionally left blank...
Page 31: ...P N 80679 Rev 10 Page 15 2 1 1 ID chuck assembly FIGURE 2 1 ID CHUCK ASSEMBLY...
Page 33: ...P N 80679 Rev 10 Page 17 2 1 3 OD mount assembly FIGURE 2 3 OD MOUNT ASSEMBLY...
Page 40: ...Page 24 FF6300 Operating Manual This page intentionally left blank...
Page 71: ...P N 80679 Rev 10 Page 55 FIGURE 3 44 BACKFACING ATTACHMENT DIMENSIONS...
Page 72: ...Page 56 FF6300 Operating Manual This page intentionally left blank...
Page 88: ...Page 72 FF6300 Operating Manual This page intentionally left blank...
Page 90: ...Page 74 FF6300 Operating Manual FIGURE 6 1 FF6300 IN CONTAINERS STEEL CONTAINER WOODEN CRATE...
Page 92: ...Page 76 FF6300 Operating Manual FIGURE 6 3 PACKING THE FF6300 WITH OD MOUNT...
Page 94: ...Page 78 FF6300 Operating Manual This page intentionally left blank...
Page 99: ...P N 80679 Rev 10 Page 83 This page intentionally left blank...
Page 126: ...Page 110 FF6300 Operating Manual This page intentionally left blank...
Page 129: ...P N 80679 Rev 10 Page 113 APPENDIX C SDS Contact CLIMAX for the current Safety Data Sheets...
Page 130: ...Page 114 FF6300 Operating Manual This page intentionally left blank...
Page 131: ......
Page 132: ......