C l i m a t e M a s t e r Wa t e r - S o u rc e H e a t P u m p s
General Information
WARNING!
To avoid the release of refrigerant into the
atmosphere, the refrigerant circuit of this unit must be
serviced only by technicians who meet local, state, and
federal profi ciency requirements.
WARNING!
All refrigerant discharged from this unit must
be recovered WITHOUT EXCEPTION. Technicians must
follow industry accepted guidelines and all local, state, and
federal statutes for the recovery and disposal of refrigerants.
If a compressor is removed from this unit, refrigerant circuit
oil will remain in the compressor. To avoid leakage of
compressor oil, refrigerant lines of the compressor must be
sealed after it is removed.
CAUTION!
To avoid equipment damage, DO NOT use
these units as a source of heating or cooling during the
construction process. The mechanical components and
fi lters will quickly become clogged with construction dirt and
debris, which may cause system damage.
WARNING!
WARNING!
WARNING!
WARNING!
CAUTION!
WARNING!
The EarthPure
®
Application and Service Manual
should be read and understood before attempting to service
refrigerant circuits with HFC-410A.
Storage
Pre-Installation
Inspection
- Upon receipt of the equipment, carefully check
the shipment against the bill of lading. Make sure all units
have been received. Inspect the packaging of each unit, and
inspect each unit for damage. Ensure that the carrier makes
proper notation of any shortages or damage on all copies of
the freight bill and completes a common carrier inspection
report. Concealed damage not discovered during unloading
must be reported to the carrier within 15 days of receipt of
shipment. If not fi led within 15 days, the freight company can
deny the claim without recourse. Note: It is the responsibility
of the purchaser to fi le all necessary claims with the carrier.
Notify your equipment supplier of all damage within fi fteen
(15) days of shipment.
Storage
- Equipment should be stored in its original
packaging in a clean, dry area. Store units in an upright
position at all times.
Unit Protection
- Cover units on the job site with either
the original packaging or an equivalent protective covering.
Cap the open ends of pipes stored on the job site. In areas
where painting, plastering, and/or spraying has not been
completed, all due precautions must be taken to avoid
physical damage to the units and contamination by foreign
material. Physical damage and contamination may prevent
proper start-up and may result in costly equipment clean-up.
Examine all pipes, fi ttings, and valves before installing
any of the system components. Remove any dirt or debris
found in or on these components.
Pre-Installation
- Installation, Operation, and Maintenance
instructions are provided with each unit. Horizontal
equipment is designed for installation above false ceiling
or in a ceiling plenum. Other unit confi gurations are
typically installed in a mechanical room. The installation
site chosen should include adequate service clearance
around the unit. Before unit start-up, read all manuals
and become familiar with the unit and its operation.
Thoroughly check the system before operation.
Safety
Warnings, cautions and notices appear throughout this
manual. Read these items carefully before attempting any
installation, service or troubleshooting of the equipment.
DANGER:
Indicates an immediate hazardous situation,
which if not avoided will result in death or serious injury.
DANGER labels on unit access panels must be observed.
WARNING:
Indicates a potentially hazardous situation,
which if not avoided could result in death or serious
injury.
CAUTION:
Indicates a potentially hazardous situation or
an unsafe practice, which if not avoided could result in
minor or moderate injury or product or property damage.
NOTICE:
Notifi cation of installation, operation or
maintenance information, which is important, but which is
not hazard-related.
WARNING!
The installation of water-source heat pumps and
all associated components, parts, and accessories which
make up the installation shall be in accordance with the
regulations of ALL authorities having jurisdiction and MUST
conform to all applicable codes. It is the responsibility of
the installing contractor to determine and comply with ALL
applicable codes and regulations.