![ClimateMaster TCH072 Installation Operation & Maintenance Download Page 25](http://html1.mh-extra.com/html/climatemaster/tch072/tch072_installation-operation-and-maintenance_2624725025.webp)
T H E S M A R T S O L U T I O N F O R E N E R G Y E F F I C I E N C Y
Tranquility
®
Compact Belt Drive (TCH/V) Series
Rev.: July 25, 2017
25
c l i m a t e m a s t e r. c o m
TCV072-240 Field Conversion of Air Discharge
Step 4
- Rotate blower assembly 90 degrees.
Reattach blower assembly to front of unit as
shown. Put belt on and retighten.
Step 5
- Replace panels and misc from step1
(not shown).
Reverse steps to convert straight discharge to
top discharge.
Step 3
- Remove (4x) Blower Mount Bolts