REV. FEBRUARY 19th 2014
CLIMA-FLEX S.A. DE C.V.
1.2. PREVIOUS TO STARTUP CHECKLIST
The following items must be checked, and written on a report, before unit´s startup.
UNIT MODEL:
UNIT SERIAL NÚMBER:
/!\ WARNING /!\
The following procedures are to be considered by
the installer; their personnel must be qualified, and certified to
perform installation in order to comply all specifications and good
practices to assure the correct unit´s operation.
1.- PHYSICAL INSPECTION (BEFORE ELECTRICAL CONECTION)
Check unit for possible transportation or handling damage.
Visually check for refrigerant leaks.
Only Open unit to install system piping. Do not remove connection´s protection until
hydraulic circuit is to be closed.
Check for foreign objects in fan discharge.
Check pulley alignment, and band tension.
Check that air intake is not obstructed and has the required space suggested on Fig. 1
1.- HYDRAULIC CIRCUIT INSPECTION
Water connections are NPT type inner thread (to identify the connection diameter, see
unit’s data
sheet). The installation of a water filter is necessary on all hydraulic circuits in order to avoid solid
particles in it, which must be installed on the return side of the circuit, and cleaned once the system´s
initial charge is finished.
Check water filter to be clean.
Verify that all service valves are open.
Check for adequate makeup water supply.
Verify that all piping is water full and air has been vented out.
Check Thermometers.
Check Manometers.
Note:
Accessories such as Thermometers, manometers, measuring ports, etc. are recommended but
not necessary for the unit´s operation.
/!\ WARNING /!\ If hydraulic circuit contains air, it may compromise the units operation.
DATE:
JOBSITE:
LOCATION:
INSTALLER CONTRACTOR:
TECHNICIAN / COMPAÑY STARTING
THE UNIT:
Summary of Contents for CLIV SERIES
Page 1: ...REV FEBRUARY 19th 2014 CLIMA FLEX S A DE C V CLIV SERIES Air cooled ...
Page 2: ...REV FEBRUARY 19th 2014 CLIMA FLEX S A DE C V Installation Manual CLIV Series ...
Page 5: ...REV FEBRUARY 19th 2014 CLIMA FLEX S A DE C V 1 2 CLIMA FLEX INSTALLATION DIAGRAM ...
Page 10: ...REV FEBRUARY 19th 2014 CLIMA FLEX S A DE C V POWER DIAGRAM CLIV ACC 036 A3S CLIV ACC 061 A3S ...
Page 19: ...REV FEBRUARY 19th 2014 CLIMA FLEX S A DE C V Operation Manual CLIV Series ...
Page 24: ...REV FEBRUARY 19th 2014 CLIMA FLEX S A DE C V Maintenance Manual CLIV Series ...