![Clever Little Box LB-5A Installation & Operating Instructions Manual Download Page 16](http://html1.mh-extra.com/html/clever-little-box/lb-5a/lb-5a_installation-and-operating-instructions-manual_2623421016.webp)
30
Appendix A: Jumpers & Connectors
Interval
J8
J9
Off
A to B
A to B
1 min
B to C
A to B
2 mins
A to B
B to C
3 mins
B to C
B to C
Table 2
– File 2 Repeat Interval Timer settings
Note:
SW2 must remain activated
Jumper
Jumper Position A and B
Jumper Position B and C
JP1
Switch 1 activated by a contact
closure
Switch 1 activated by an opening
contact
JP2
Switch 2 activated by a contact
closure
Switch 2 activated by an opening
contact
JP3
Switch 3 activated by a contact
closure
Switch 3 activated by an opening
contact
JP4
Switch 4 activated by a contact
closure
Switch 4 activated by an opening
contact
JP5
Switch 5 activated by a contact
closure
Switch 5 activated by an opening
contact
Table 1 –
Switch Activation Settings, whether triggering is by Normally Open (N/O)
or Normally Closed (N/C) contacts
Note:
PIRs are usually configured to have opening contacts when triggered
Position A and B
Stereo
Position B and C
Mono
Table 3
– J10 Audio Output Mono / Stereo select