PV-ezRack SolarTripod (double and single) Installation guide V2
Page 11 of 15
11/20 Duerdin St
Tel: +61 3 9017 6688
Clayton VIC 3168, Australia
Fax: +61 3 9017 6668
www.clenergy.com.au
Email: [email protected]
5
Step by step installation
5.1 Installation of the Tripod support (based on Double tripod)
5.1.1 Unfold the tripod
support. Check the purlin
distance and pre drill the
holes on the base of the
Tripod support. In case the
predrilled holes on the
support
base
are
covered/not accessible by
the back or front tubes fix
the base of the support to
the roof first, otherwise
proceed with 5.1.2
5.1.2 Fix the back tubes to
the upper support by using
hex head bolts M10*65,
Spring
Washer,
Flat
Washer and Hex nuts M10.
5.1.3 Fix the tubes with
U
Bracket
to
the
base
support by using hex head
bolts
M10*65,
Spring
Washer, Flat Washer and
Hex nuts M10.