3
/ 9
No. 999-1009, Min’an Avenue, Xiang’an 18/20 Duerdin ,
Xiamen China 361006 Clayton VIC 3168
Tel: +86-592-5781288 Tel: +61-3-90176688
Fax: +86-592-5782298 Fax: +61-3-90176668
Email:
Email:
Website:
www.clenergy.com.cn
Website: www.clenergy.com.au
3. System Overview
3.1 Overview of PV-ezRack SolarMatrix
3.2 Stainless Steel Fastener Installation Precautions
Improper operation may lead to deadlock of Bolts and Nut. Follow the steps below to
reduce this risk
1
.
Reduce the friction coefficient:
(
1
)
Ensure that the thread surface is clean and free of dirt or contaminant;
(
2
)
Apply lubricant (grease or 40# engine oil) to fasteners prior tightening to avoid
galling or seizing in the threads;
2
.
General installation instructions:
(
1
)
Apply force to fasteners in the direction of axis of thread;
(
2
)
Apply force uniformly, to maintain required torque;
(
3
)
Professional tools and tool belts are recommended;
(
4
)
Avoid using electric tools for final tightening;
(
5
)
Avoid working at high temperatures;