background image

 

4

 / 9 

No. 999-1009, Min’an Avenue, Xiang’an                                                                                                      18/20 Duerdin , 

Xiamen China 361006                                                                                                                             Clayton VIC 3168 
Tel: +86-592-5781288                                                                                                                      Tel: +61-3-90176688 

Fax: +86-592-5782298                                                                                                                    Fax: +61-3-90176668 
Email: 

[email protected]

                                                                                              Email: 

[email protected]

 

Website: 

www.clenergy.com.cn

                                                                                            Website: www.clenergy.com.au 

 

3

Safe Torques 

 Please refer to safe torques defined in this guide as shown below; In case power tools 

are required, Clenergy recommends only low-speed tools. High-speed and impact 

drivers increase the risk of bolt galling (deadlock). If deadlock occurs, you need to cut 

fasteners please make sure that there is no load on the fastener before you cut it. Avoid 

damaging the anodized or galvanized surfaces.  

 

 

 

 

4. These steps should be applied for every stainless steel nut and bolt assembly.  

 

 

 

 

Summary of Contents for PV-ezRack SolarMatrix

Page 1: ...PV ezRack SolarMatrix Installation Guide V2 0 NO PZ06 IM02 20 Content 1 Product Introduction 1 2 Tools Components 2 3 System overview 3 4 Installation Instructions 6 5 Warranty 9 ...

Page 2: ...ols Please review this manual thoroughly prior to installing PV ezRack SolarMatrix This manual provides supporting documentation for building permit applications relating to PV ezRack SolarMatrix Mounting system When installed in accordance with this guide the PV ezRack SolarMatrix parts will be structurally adequate and adhere to AS NZS1170 IBC2006 and California 2007 building code During install...

Page 3: ...www clenergy com au 2 Tools and Components 2 1Tools Allen Key for 6 8mm String Torque Wrench 5m Tape Note The above tools are used for mounting system installation only and not included in supply scope Any tools for electronic parts installation please consult system installer 2 2 Components ER IC SM Inter Clamp ER EC SM End Clamp ER L SM Front Leg ER RC SM Rail Cross Connector ER L SM Back leg ER...

Page 4: ...ration may lead to deadlock of Bolts and Nut Follow the steps below to reduce this risk 1 Reduce the friction coefficient 1 Ensure that the thread surface is clean and free of dirt or contaminant 2 Apply lubricant grease or 40 engine oil to fasteners prior tightening to avoid galling or seizing in the threads 2 General installation instructions 1 Apply force to fasteners in the direction of axis o...

Page 5: ... 3 Safe Torques Please refer to safe torques defined in this guide as shown below In case power tools are required Clenergy recommends only low speed tools High speed and impact drivers increase the risk of bolt galling deadlock If deadlock occurs you need to cut fasteners please make sure that there is no load on the fastener before you cut it Avoid damaging the anodized or galvanized surfaces 4 ...

Page 6: ...Front Leg and Back Leg is 900mm 3 The installation span L2 between Front Leg and Back Leg is up to specific engineering requirements 4 The installation span L3 between Front Leg and Rail Cross Connector is 30mm 5 End Clamp or Inter Clamp is installed on Front Leg and Back Leg to fasten PV modules 3 4 Installation Dimensions All drawings and dimensions in this installation guide are for a generic r...

Page 7: ...ction drawing please provide marked up drawings sketches for Clenergy s review prior to modification for comment and approval 4 Installation Instruction 4 1 Install MT Rail 4 1 1 Place MT Rail along both length and width direction according to your planning as shown in Figure 1 4 1 2 Use Rail Cross Connector to connect MT Rails and fasten with Bolts M10 45 tightly as shown in Figure 2 and 3 Recomm...

Page 8: ...s shown in Figure 6 and 7 Note please pay attention to the installation direction of Front Leg and Back Leg Recommended torque for M8 20 is 18 20 N m Figure 6 Figure 7 4 4 Install PV module 4 4 1 Place the PV module on Front Leg and Back Leg and fasten with End Clamp and Inter Clamp tightly as shown in Figure 8 and 9 Recommended torque for Bolts M8 of End and Inter Clamp is 18 20 N m Figure 8 Figu...

Page 9: ...298 Fax 61 3 90176668 Email sales clenergy com cn Email sales clenergy com au Website www clenergy com cn Website www clenergy com au 4 5 2 Fasten Wind Deflector Wind Deflector Connector and MT Rail along length direction with Bolts M8 20 tightly as shown in Figure 11 and 12 Recommended torque for Bolts M8 20 is 18 20 N m Figure 11 Figure 12 ...

Page 10: ...ance for Architecturally Finished Aluminum www aamanet org are not followed by Purchaser This Warranty does not cover damage to the Product that occurs during its shipment storage or installation This Warranty shall be VOID if installation of the Product is not performed in accordance with Clenergy s written installation instructions or if the Product has been modified repaired or reworked in a ma...

Reviews: