Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected] www.clenergy.com.au
4
page
of 15
Installation Guide_PostMount 3-A for XL Panels_AU_V1.1 (January 2021)
3.2 Precautionary Measures for Stainless-Steel Fastener Installation
Improper operation may lead to the deadlock of bolts and nuts. Follow the steps below to reduce this
risk.
3.2.1 Reduce the friction coefficient
(
1) Ensure that the thread surface is clean (no dirt or contaminant).
(2) Apply lubricant (grease or 40# engine oil) to fasteners prior to tightening to avoid galling or
seizing in the threads.
System Overview