Installation Guide / PostMount 1-A for XL Panel
12
Code-Compliant Planning and Installation Guide V 1.1 - Complying with AS/NZS1170.2-2011 ADMT 4-2016
- Certification -
REF: CL-10129-S
Internal REF: 00142
8.
Footing depths are for reference only. The characteristics of the soil must be checked on site
by a technical expert. A soil report assessment is always recommended and Clenergy must be
informed on the outcome of the soil report.
Construction is to be carried out strictly on accordance with the instruction manual. This work was
designed in accordance with the provisions of Australian Building Regulations and in accordance with
sound, widely accepted engineering principles.
Should you have any queries, do not hesitate to contact us.
Best Regards,
Alberto Escobar
Civil/Structural Engineer
BEng MIEAust NER
BRP EC 46542
RPEQ 18759