Installation Instruction
Figure. 1
L=50±5mm
5.1 Post and Girder Installation
5. Installation Instruction
Prepare the required installation tools and products
before installation.
As per engineering drawings, mark out the positions
for bolts and embed 4pcs of M20 bolt in each
position as shown in Figure 2.
Make sure all M20 bolts are aligned in both
horizontal and vertical direction. All embedded bolts
will be revealed 50±5mm above the ground as
shown in Figure 1.
Note: The M20 bolts and matching nuts, washers
and spring washers are provided by installer.
As shown in Figure 3, place bolts M12*35 into H
Joint 130/240.
5.1.1
5.1.2
Figure. 3
Figure. 2
Installation Instruction
According to the engineering drawing, slide H Joint 130/240 to the corresponding position on the Girder and
lock it as shown in Figure 4.
For sliding smoothly, to ensure the plane of the M12 bolt cap be parallel to the Girder slot surface when H
Joints slide into the Girder, as shown in Figure 5.
Recommended torque for M12 bolts is 40-43N·m
Figure. 4
5.1.3
According to the engineering drawing, place different length Rectangular Tube 100*90 and T Base 200/280 by
below steps, as shown in Figure 6.
Figure. 5
①
Place the Rectangular Tube L1 horizontally to align with the hole of H Joint 240 near the end of
girder , place bushing in one hand and put on bolts M16*130 in the other hand, then put on flat
washers, spring washers, nuts and lock manually.
②
Laying down the Rectangular Tube L2, and follow step
①
to complete the other hole installation
of H Joint 240.