Installation Instruction
5.5.5
After the last step, adjust Corrugated Clamp to engage the corrugated surface of Water Guide Rail 60
and the clamp are Meshed, then lock the Corrugated Clamp as shown in Figure 25.
Recommended torque for M8 bolts is 12-15N·m
5.5.3
Tilt the Gutter , and place it between the bottom
of the PV Module and the Water Guide Rail60 as
shown in Figure 24 .The order of the Gutter is the
same as the PV Module, from low to high, and from
left to right.
5.5.4
Straighten the Gutter, make sure the centre of the
Gutter is parallel to the frame line of PV Module and
downward by about 5mm as shown in Figure 24.
Figure. 24
Figure. 25
Installation Instruction
5.5.6
After placing an array of Gutter as shown in
Figure 26, make sure the Gutters in each row
are on the same line.
5.5.7
After the installation is completed, check to
ensure all bolts are locked, and the installation
is complete as shown in Figure 27.
Figure. 26
Figure. 27
Note: The distance of the two ends of Gutter over
the Water Guide Rail60 is equal as shown in Figure
25.
Equal
Exposure
distance