Installation Instruction

5.4.2 

According to the Figure, place the first row of PV Module on the Water Guide Rail60 one by one. The order of 
the PV Module is from low to high, and from left to right as shown in Figure 19.

Figure. 19

Installation Instruction

Note: Make sure each row of PV Module is without 
gap, PV Modules are attached closely with the 
Rails, and the ends of PV Module are aligned. Then 
fasten Inter Clamps and End Clamps as shown in 
Figure 20.

Recommended torque for M8 bolts is 18-20N·m

Horizontal and vertical aligned

Figure. 20

Without gap

5.5.1 

Slide two sets of Corrugated Clamps into the bottom of the Gutter, and do not fasten the bolts as shown in 
Figure 21.

5.5  Gutter Installation

Figure. 21

Figure. 22

5.5.2

Put the Rubber Ring into the Gutter and plug the bottom slot. Ensure the Rubber Ring is aligned with the ends 
of Gutter. Glue evenly the connection as shown in Figure 22

The effect of installation among Gutter, Corrugated Clamp and Rubber Ring as shown in Figure 23.

Figure. 23

Summary of Contents for PV-ezRack ezShade 2.0

Page 1: ...PV ezRack ezShade 2 0 Installation Guide V1 0...

Page 2: ...ate occupational health and safety regulations Please also pay attention to other relevant regulations in your local region Please check that you are using the latest version of the installation manua...

Page 3: ...ng to the figure above applying PV module 1960x992x35mm tilt angle 5 degree The MAX height from the ground is 2572mm The specific installation steps are as follows Planning 3 1 Installation Tools 3 To...

Page 4: ...Clamp R SDII 168 Rail 168 HJ SDII 158 240 H Joint 240 RR GU SDII 22 Rubber ring for Gutter 22 SP SDII R 168 Splice for Rail 168 BA SDII 200 Corrugated T Base 200 G SDII 150 4300 Girder 150 4300 BA SDI...

Page 5: ...the threads 4 2 2 General installation instructions Apply force to fasteners in the direction of thread Apply force uniformly to maintain required torque Professional tools and tool belts are recomme...

Page 6: ...1 Note The M20 bolts and matching nuts washers and spring washers are provided by installer As shown in Figure 3 place bolts M12 35 into H Joint 130 240 5 1 1 5 1 2 Figure 3 Figure 2 Installation Ins...

Page 7: ...n bolts M16 150 bushings flat washers spring washers and lock manually Keep the Tube L1 flat install the other hole with Corrugated T Base 200 Laying down the support rotate Tube L2 and Tube L3 align...

Page 8: ...nts if there is deviation The adjustment range of the slot hole of T Base as shown in Figure 10 Fasten all bolts after adjustment Recommended torque for M16 bolts is 100 105 N m M20 is 200 220 N m Fig...

Page 9: ...shown in Figure 16 5 3 Rail 60 Installation Figure 15 Figure 16 5 3 2 According to engineering drawings repeat the above operations to install the other Water Guide Rail 60 as shown in Figure 17 Note...

Page 10: ...hown in Figure 19 Figure 19 Installation Instruction Note Make sure each row of PV Module is without gap PV Modules are attached closely with the Rails and the ends of PV Module are aligned Then faste...

Page 11: ...8 bolts is 12 15N m 5 5 3 Tilt the Gutter and place it between the bottom of the PV Module and the Water Guide Rail60 as shown in Figure 24 The order of the Gutter is the same as the PV Module from lo...

Page 12: ...cho Yokohama 231 0023 Japan Tel 81 45 228 8226 Fax 81 45 228 8316 E mail sales clenergy co jp www clenergy jp Clenergy Philippines 145 Yakal St San Antonio village Makati City Philippines Tel 63 977 8...