1994d_Reparatur_en-bedingt.fm, 12.06.2014
P1992BA/EN 2014-06
23
Assembly instructions
7
7.2
Install pulse unit
7.2.1
Assembling the hydraulic blades
NOTE
To prevent damage, lubricate the gaskets and O-rings using grease (order no. 914392) before assembly.
1
2
3
4
5
6
7
8
<F1>
<93>
<F1>
<98>
<93>
<97>
<95>
<94>
(2×)
<97>
<96>
(2×)
<F1>
<93>
<91>
<F1>
<F2>
Tightening torque
50+10 Nm
WAF 1/2"
<D3>
<D2>
<D1>
<84>
Summary of Contents for 20PHH
Page 12: ...12 P1992BA EN 2014 06 1994b_1_5_en bedingt fm 12 06 2014 Before initial operation 4 ...
Page 18: ...18 P1992BA EN 2014 06 1994c_Wartung_en bedingt fm 12 06 2014 Maintenance 5 Empty side ...
Page 24: ...24 P1992BA EN 2014 06 1994d_Reparatur_en bedingt fm 12 06 2014 Assembly instructions 7 ...