
Master Panel 8
Section 4 — Troubleshooting
Part No. 750-375
4-9
8. Insert SD card into the card slot of the processor. Take care to
insert card in the correct orientation.
9. Put mode selection switch in RUN mode.
10.Cycle power to the controller.
11.MS and OK lights will be red and CF light will be flashing. When
I/O light stops flashing and OK and RUN lights are green it is safe
to remove flash card. The whole process from power up takes
about 30-60 seconds.
12.Plug in serial (if required) and Ethernet (if required) cables and
confirm the operation.
RUN
position
Summary of Contents for Master Panel 8
Page 1: ...750 375 10 16 Master Panel 8 Eight Boiler Lead Lag Control Operation Manual...
Page 4: ......
Page 6: ......
Page 7: ...www cleaverbrooks com Section 1 Overview A Features 1 2 B Components 1 2 C Specifications 1 4...
Page 55: ...www cleaverbrooks com Section 5 Parts Master Panel 8 Parts List 5 3...
Page 56: ...Section 5 Parts Master Panel 8 5 2 Part No 750 375...
Page 58: ...Section 5 Parts Master Panel 8 5 4 Part No 750 375...
Page 60: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...