background image

 

11 

Maintenance 

The  Power  Supply  uses  all  solid-state  components  and  should  require  no 

maintenance or recalibration under normal use. If the unit must be returned for 

repair, contact our

 SERVICE DEPARTMENT

 or your local authorized Cleaver 

Scientific distributor.   

 

 

Section 7  Warranty 

 

Cleaver  Scientific  warrants  apparatus  of  its  manufacture  against  defects  in 

materials  and  workmanship,  under  normal  service,  for 

one  year  from  the 

shipping date to purchaser

. This warranty excludes damages resulting from 

shipping, misuse,  carelessness, or neglect. 

Cleaver Scientific’s liability under 

the warranty is limited to the receipt of reasonable proof by the customer that 

the defect is embraced within the terms of the warranty. All claims made under 

this warranty must be presented to Cleaver Scientific within one year following 

the date of delivery of the product to the customer.

 

 

Contact Information

   

Cleaver Scientific Ltd.   

 

Address:

   

Unit 41 

Somers Road Industrial Estate 

 

Rugby 
CV22 7DH 

United Kingdom 

 

T/ +44 (0)1788 565300 

F/ +44 (0)1788 552822 

 

[email protected]

 

www.cleaverscientific.com

 

 

Summary of Contents for TPS150V

Page 1: ...1 TPS150V Power Supply Instruction manual www cleaverscientific com com info cleaverscientific com...

Page 2: ...is liable for all missing or damaged parts accessories within 7 days after customer received this instrument package Please contact Cleaver Scientific immediately regarding this issue If no response w...

Page 3: ...he user to read the following points carefully before operating this equipment 1 Read and follow the manual instructions carefully 2 Do not alter the equipment Failure to follow these directions could...

Page 4: ...2000 meters 5 Ambient to 40 C operating temperature 6 Pollution degree 2 7 Mains supply voltage fluctuations up to 10 of the normal voltage Avoiding Electrical Shock Follow the guidelines below to ens...

Page 5: ...age the equipment Equipment Operation Follow the guidelines below to ensure safe operation of the unit 1 NEVER access dangerous chemicals or other materials to prevent possible hazard of explosion and...

Page 6: ...Warning 3 Section 1 Introduction 7 1 1 Overview 7 Section 2 Technical Specification 8 Section 3 Installation Instructions 9 Section 4 Operation Instructions 9 4 1 Start the operation Error Bookmark no...

Page 7: ...leaver Scientific TPS150V Power Supply is uniquely equipped with specifications to address the majority of electrophoresis applications Output voltages can be selected between 75 150V giving reproduci...

Page 8: ...ge Inc 75 or 150V Output Current Inc 0 300mA Output Type Constant Voltage Terminal Pairs 2 Pairs Operation Temperature Ambient to 40 Unit Dimension 100 x 191 x 100mm Construction material High Impact...

Page 9: ...it is placed on a sturdy and level surface in a safe dry place and is connected to a suitably prepared electrophoresis system it is ready for operation Section 4 Operation Instructions 4 1 To operate...

Page 10: ...the ON OFF switch Turn the screwdriver to gently pry open the fuse compartment Note The fuse compartment will not open with the power cord in place 3 Pull the fuse holder out of the compartment and in...

Page 11: ...to purchaser This warranty excludes damages resulting from shipping misuse carelessness or neglect Cleaver Scientific s liability under the warranty is limited to the receipt of reasonable proof by t...

Page 12: ...12...

Reviews: