1
This Installation and Operation Man u al is
written to assist in the in stal la tion, operation
and main te nance of ozone delivery sys tems
man u fac tured by Clear Wa ter Tech, LLC. The
equip ment has been de signed using the most
mod ern ma te ri als and tech nol o gy available.
Please read this manual care ful ly and in its
entirety before pro ceed ing with any in stal -
la tion, op er a tion or main te nance pro ce dure
associated with this equip ment. Failure to
follow these instructions could result in
personal injury, damage to the equip ment or
reduced product performance.
In an ongoing effort to improve reliability
and operating ef fi cien cy, Clear Wa ter Tech
may fi nd it nec es sary to make chang es to its
prod ucts. Therefore, the in for ma tion con tained
in this man u al may not con form in ev ery
respect to earlier ver sions of ClearWaterTech
ozone systems found in the fi eld. If you have
any ques tions, please con tact your ClearWater
Tech deal er or the Clear Wa ter Tech ser vice
department.
Introduction
............................................................................................................................
3
O
Summary of Contents for CD15/O2
Page 8: ...7 M 15 02 UNIT DIAGRAM ...
Page 9: ...8 CD15 02 UNIT DIAGRAM ...
Page 10: ...9 P 20 02 UNIT DIAGRAM ...
Page 11: ...10 CD 20 02 UNIT DIAGRAM ...
Page 13: ...12 M 15 02 CD 15 02 ENLARGED VIEW OF TUBING PLUMBING CONNECTIONS ...
Page 14: ...13 P 20 2 CD 20 02 ENLARGED VIEW OF TUBING PLUMBING CONNECTIONS ...
Page 16: ...15 M 15 02 CD 15 02 INTERLOCK WIRING CONNECTIONS ...
Page 17: ...16 P 20 2 CD 20 02 INTERLOCK WIRING CONNECTIONS ...
Page 28: ...27 ENLARGED VIEW OF CORONA DISCHARGE REACTION CHAMBER ...
Page 29: ...28 ELECTRICAL INTERLOCK BOX SOLENOID VALVE ...
Page 33: ...32 DRIVE MODULE WIRING FOR M 15 O2 P 20 O2 ...
Page 34: ...33 DRIVE MODULE WIRING FOR CD 15 O2 CD 20 O2 ...