18
Revision date: 06.19.12
Cable
Bracket
Cable
Bracket
Purlin
Ground Level
Ridge Purlin
G
F
E
Frame length of your building
may differ from what is shown.
Frame Assembly
FRAME ASSEMBLY (continued)
With the first three (3) rafters assembled, take the first top purlin and
9.
secure it to the rafters using Tek screws. See Diagrams D and E at
the right.
Consult the Over-the-Top Measurements diagram in the
Quick Start section for purlin spacing dimensions.
NOTE:
In those instances where a top purlin and an interior rafter are
also used to attach two cable assemblies, install the 108873 raf
ter
cable plate (single) between the rafter and purlin using Tek screws (F).
36', 48', and 60' Long Frame:
When four (4) cable assemblies meet
at the same top purlin and rafter, install a 108874 rafter cable plate
(double) to secure the cables (G).
Consult the Quick Start guide for
additional details
regarding the location and installation of the rafter
cable plates
. Use assistants when installing the plates.
Install and secure the remaining top purlins for the first few rafters as
10.
previously described and as shown in the Quick Start section of these
instructions.
Repeat the previous steps to assemble the remainder of the frame.
11.
ATTENTION:
You must install the ridge purlins after setting two or
three rafters.
Do not set all remaining rafters with only the ridge purlins
in place. Install top purlins for additional support.
When mounting the
remaining end rafter, remember to install the two (2) angled cable
brackets as described in Steps 1 and 2.
Rafter
FA4484B Tek screw
D
Purlin
E
Rafter
Purlin
108873
Rafter Cable
Plate (single)
F
FA4484B
108874
Rafter Cable
Plate (double)
G
FA4484B