CLEARSPAN
™
COMMERCIAL CANOPIES
10
Revision date: 06.22.10
OPTIONAL INSTALLATION - END and/or SIDE PANELS
If the shelter includes the optional side panels and/or
end panels, these panels MUST be attached to the
frame
before
the cover is installed. If the shelter does not
include the optional panels, continue with the main cover
installation.
NOTE:
Optional gable ends and side panels (additional
purchase required) are attached to the frame using ball tie
downs in the manner illustrated below. If equipped, secure
the panels to the frame before installing the main cover.
Unpack panels and unfold completely.
1.
After anchoring the frame, place the Ball Tie
2.
Downs through the grommet holes and loop around
the lower end rafter legs.
ANCHOR THE SHELTER
At this point, anchor the shelter. Consult the MUST READ
document for anchoring information and suggestions.
Please call customer service at 1-800-245-9881 for
additional anchoring information.
CAUTION
: The anchor assembly is an integral part of
the shelter construction. Improper anchoring may
cause shelter instability and failure of the structure
to perform as designed. Failing to anchor the shelter
properly will void the manufacturer’s warranty and may
cause serious injury and damage.
Install all side panels and/or end panels and continue
3.
with the main cover.
WARNING:
Do not install panels without first anchoring
the assembled frame.
Optional
Side Panel
INSTALL MAIN COVER
Gather the parts:
Ratchets (1" 4000lb)
•
Pipes 1.315" (See chart below.)
•
Cover
•
Ropes long enough to reach over the frame (supplied
•
by customer)
Tek screws and duct tape (supplied by customer)
•
WARNING:
To prevent damage to the cover and to
prevent serious personal injury, DO NOT attempt to
install the cover on windy days.
Locate the pipes for two (2) main cover conduits. Each
1.
cover conduit consists of the following pipes. See chart
below.
These cover conduits are inserted into the pockets
sealed to the cover. The conduits are used to tighten
and secure the cover.
After assembling the cover conduits, locate the cover
3.
and unfold it on a clean, smooth surface near the
frame.
NOTE:
When handling the cover and setting it in
position, do not pull on the end straps. They will pull out
of the cover. Unfold the cover with the inside surface
facing up.
1˝
Connect these pipes by inserting the swaged ends
2.
of the pipes into the plain ends until each conduit is
assembled. Secure each pipe joint with a Tek screw
and wrap the joint with duct tape.
Cover Conduit Lengths
Length
Pipes
20'
(3) 75'' & (1) 25.5''
30'
(4) 75'' & (1) 73.5''
40'
(6) 75'' & (1) 49.5''
50'
(8) 75'' & (1) 25.5''
60'
(9) 75'' & (1) 73.5''