13
CLEARSPAN™ SCREEN HOUSE
Revision date: 12.19.07
Frame shown without end panels for clarity.
SQUARE THE ASSEMBLED FRAME
1.
With the frame in position, perform a final square of
the frame by measuring diagonally (corner-to-corner)
at the bottom of the legs and verify that the two
measurements are equal. Adjust if needed.
2. Adjust width. Measure width from center of rafter leg to
center of other rafter leg of the
same rafter assembly
.
Adjust if needed.
3. Examine the frame and remove any sharp edges from
the frame or reposition screws so they do not come in
contact with the roof covers.
4. After the frame is squared, read or reread the
MUST
READ
document and anchor the frame in place before
installing the cover or end panels.
ANCHOR THE FRAME
At this point in the assembly process, anchor the
assembled frame. Once the frame assembly is anchored
properly, continue with these instructions.
WARNING:
Securing the legs to concrete blocks or
wood boards set on the site is not a substitute for
properly anchoring the shelter. You must anchor the
shelter to the site.
FAILING TO PROPERLY ANCHOR THE SHELTER
WILL RESULT IN DAMAGE TO THE SHELTER AND
MAY CAUSE PERSONAL INJURY.
Turnbuckles and ground anchors are suitable to anchor this
type of shelter. Consult a reliable construction professional
if you need assistance when anchoring the assembled
frame.
Contact Customer Service at 1-800-245-9881 to purchase
additional parts to anchor the shelter.
DO NOT INSTALL OR ATTEMPT TO INSTALL END
PANELS OR THE MAIN COVER DURING WINDY OR
STORMY CONDITIONS.
Space below is reserved for customer notes.