background image

CLEARSPAN

 JUBILEE TENTS

8

Revision date: 05.19.09

ASSEMBLE THE JUBILEE TENT COMPONENTS

NOTE: 

Assistance is required to assemble the tent.

RAFTER ASSEMBLY

Gather the parts:
•  Rafter pipe (#190S099D)
•  Rafter pipe (#190S099)
•  Rafter pipe (#190P0825)
•  Rafter pipe (#190P095D)
•  Rafter pipe (#190P030D)  
•  Rafter pipe (#190P00575)    

Each rafter assembly will consist of two (2) pipes. Consult 

the chart below to verify the correct pipe lengths.

Rafter Assemblies

Rafter Type

Pipe Lengths

Number of 

Rafters

Base Rafter

19 190P075D

11

Lower Base Rafter

1 190P0825

10

Side Rafter

19 190P095D

6

Mid Rafter

190S099 (2) + 190P00575

2

Hip Rafter

19 190P030D

16

NOTE:

  Only the lower base rafters and mid rafters are 

assembled with190S099 pipes. All other rafters are 

assembled with a 190S099D pipe.  Keep the different rafter 

types separate for easier assembly.

Rafter Assembly Procedure
1.  Select the two (2) pipes needed to assemble a 

particular rafter (see chart above) and arrange these on 

a flat surface.

2.  Slide the swaged portion of each pipe into the end of 

the plain pipe that does not have holes. Position drilled 

bolt holes at each end of the assembled rafters.

FRAME ASSEMBLY

Gather the parts:
•  All rafter assemblies
•  Leg pipe (#190P094D)
•  Crown Coupler (#103931)
•  Corner Coupler (#103933)
•  Side Coupler (#103935)
•  Hip Coupler (#103936)
•  Short Cross (#10015808)
•  3-Way Open Corner (#10015608)
•  Short Tee Swivel (#105944)
•  1/4" Carriage Bolts and 1/4" Nuts 
•  Tek Screws and Duct tape (customer-supplied)

Frame Assembly Procedure

When connecting the rafters to the coupler fittings, use the 

first/outermost hole in the coupler fittings to secure each 

rafter with a carriage bolt and nut.

When placing a carriage 

bolt and nut, position bolt 

as shown below to prevent 

damage to cover.

ATTENTION

: Once the holes of the rafters and the 

couplers have been aligned and secured with a carriage 

bolt and nut, secure each rafter pipe connection with a Tek 

screw. 

Do not connect with a Tek screw until rafter pipe 

has been secured. 

 Make sure the head of the Tek screw is 

drilled in a position where it will not contact the main cover. 

The following steps are only a suggested procedure for 

assembling the frame. Regardless of how you choose to 

assemble the tent, however, you must follow Step 6 when 

assembling the hip rafters, as it is the only way to properly 

fit the frame together.

Summary of Contents for 103942

Page 1: ...S Revision date 05 19 09 2008 ClearSpan All Rights Reserved Reproduction is prohibited without permission Photo may show a different but similar model ClearSpan Jubilee Frame Tent STK DIMENSION 103942 104514 30 Wide x 45 Long ...

Page 2: ... Failing to anchor the shelter properly will void the manufacturer s warranty and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether u...

Page 3: ...efore you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of connected pipes to form a conduit Each pipe joint of a conduit assembly is secured with a self tapping Tek screw Coupler or Fitting A part of the frame assembly where legs purlins and rafter pipes are inserted and secured I...

Page 4: ...e legs of the frame The baseboard runs from the front to the back of the building This baseboard is not included with the shipment and must be supplied by the customer Treated or recycled plastic lumber works well for a baseboard The baseboard when installed properly helps prevent the shelter from sinking into the ground when anchored Consult these instructions or contact Customer Service for addi...

Page 5: ...different parts of the building Consult the Frame Overview for additional details and diagrams Some parts are not shown 103933 Corner Coupler 103931 Crown Coupler 100441 Nut Setter 105944 Short Tee Swivel 10015808 Short Cross 10015608 3 Way Open Corner FAH007B FALB01B Carriage Bolt and Nut 103935 Side Coupler 103936 Hip Coupler ...

Page 6: ...he individual sections of these instructions See illustration below to identify main parts of shelter 1 Layout the site and identify the required parts for each assembly procedure 2 Assemble all rafters 3 Assemble and anchor the frame 4 Prepare and install the main cover For best results assemble the frame as shown in this manual S i d e R a f t e r S i d e R a f t e r M i d R a f t e r Base Rafte...

Page 7: ...fer to diagram Using multiples of 3 4 5 such as 6 8 10 or 12 16 20 helps to maintain an accurate 90 angle 3 After squaring the position of the building and placing a stake at all corners string a line between the stakes to mark the base of the building 4 Next paint or mark a line on the ground using the strings between the stakes as guides NOTE If a baseboard is used drill holes through the board ...

Page 8: ...t does not have holes Position drilled bolt holes at each end of the assembled rafters FRAME ASSEMBLY Gather the parts All rafter assemblies Leg pipe 190P094D Crown Coupler 103931 Corner Coupler 103933 Side Coupler 103935 Hip Coupler 103936 Short Cross 10015808 3 Way Open Corner 10015608 Short Tee Swivel 105944 1 4 Carriage Bolts and 1 4 Nuts Tek Screws and Duct tape customer supplied Frame Assemb...

Page 9: ... NOTE Measure each rafter before assembly to verify that you have selected the correct pipes Base Rafter Crown Coupler Crown Coupler ShortTee Swivel ShortTee Swivel TOP VIEW Step 2 Assemble Mid Rafters a Connect the two 2 mid rafters 197 3 4 to the short tee swivels in the middle of the top ridge b Connect the remaining two 2 short tee swivels to the free ends of the mid rafters NOTE Do not tighte...

Page 10: ...rs b Secure each connection with a carriage bolt and nut This will serve as the mid section of the frame NOTE Once base rafters are in place center and tighten the mid rafters using a 5 16 hex key MID SECTION TOP VIEW OVERVIEW Dashed line shows assembly section NOTE Side coupler slots that face inside the mid section are not used Side Rafter Side Rafter Side Coupler Side Coupler Base Rafter Base R...

Page 11: ...the remaining side rafters 191 to the crown couplers b Connect a side coupler to the free end of each rafter c Secure each connection with a carriage bolt and nut Side Rafter Side Rafter Side Coupler Side Coupler TOP VIEW OVERVIEW Dashed lines show assembly section FRAME ASSEMBLY continued ...

Page 12: ...le Base Rafters a Connect the base rafters 171 and corner couplers b Secure each connection with a carriage bolt and nut TOP VIEW Base Rafters Base Rafters Base Rafters Base Rafters Corner Coupler OVERVIEW Dashed line shows assembly section FRAME ASSEMBLY continued ...

Page 13: ...ep 6 Assemble Corner to Crown Coupler Hip Rafters a Connect all hip rafters 126 and hip couplers as shown in the diagram b Verify that bolts are properly positioned and tight FRAME ASSEMBLY continued TOP VIEW Hip Couplers Hip Rafters Corner Crown Coupler ...

Page 14: ...ipes forcibly pull apart in order to connect the two ends together as shown in the diagrams below d Repeat steps a c for each hip rafter e Check all carriage bolts and nuts to ensure they are tight and installed properly with the bolt head toward the cover f Continue by installing the leg pipes CAUTION Keep hands and fingers from between the pipes when fitting them together TOP VIEW Grab pipes at ...

Page 15: ...ed use ladders and or steady platforms to safely elevate the frame 1 Gather the ten 10 sections of 190P094D pipe for the legs 2 Starting at two corners carefully hoist the roof section of the frame high enough to slide leg pipes holes first into the corner couplers Align the holes and secure with a carriage bolt and nut Support the frame between the corners with a temporary brace if needed 3 Move ...

Page 16: ...he shelter You must anchor the shelter as described in the MUST READ document FAILING TO PROPERLY ANCHOR THE SHELTER WILL RESULT IN DAMAGE TO THE SHELTER AND MAY CAUSE PERSONAL INJURY READ THE MUST READ DOCUMENT TO PROPERLY ANCHOR THE SHELTER After anchoring the frame check the frame for rough edges as described in the following procedure FINAL FRAME CHECK 1 Return to the frame connections and ver...

Page 17: ...re the cover does not snag One person is required at each rope and one or more may need to be inside the frame guiding the cover 4 Once the main cover is pulled into position center the cover on the frame Temporarily secure the cover to the frame using a few short sections of rope 5 Beginning at a corner thread the end of rope through a grommet and around the lower base rafter Use the lacing patte...

Page 18: ...al Side Panel 1 2 3 NOTE A space will remain between the cover edge and the frame as shown in the diagrams 3 Install all side panels and or end panels Actual frame may differ from frame shown SHELTER CARE AND MAINTENANCE Proper care and maintenance of your shelter is important Check the following items periodically to properly maintain your shelter Regularly check the main cover and panels if equi...

Page 19: ...fter H i p R a f t e r H i p R a f t e r H i p R a f t e r H i p R a f t e r Side Rafter Side Rafter Side Rafter Side Rafter Side Rafter Side Rafter Mid Rafter Mid Rafter C r o w n C o u p l e r S h o r t T e e S w i v e l C o r n e r C o u p l e r FULL FRAME TOP VIEW Hip Coupler Hip Coupler Hip Coupler Hip Coupler Side Coupler Side Coupler ...

Page 20: ...CLEARSPAN JUBILEE TENTS 20 Revision date 05 19 09 LOWER BASE TOP VIEW ...

Page 21: ...21 CLEARSPAN JUBILEE TENTS Revision date 05 19 09 Space below is reserved for customer notes ...

Reviews: