FRAME ASSEMBLY
Frame Assembly Procedure
1. Using the proper lifts and with assistance, carefully stand
the first
end rafter
assembly and place the leg pipes into
the first set of ground posts. Position the bolt side of the
end clamps to the inside of the frame as shown below.
IMPORTANT:
Brace the first rafter in position as
needed to keep it from moving. Bracing is removed
after
additional rafters are installed and secured to the other
rafters.
2. Align the top hole in the ground post with the hole in the
rafter and insert a 5/16" x 2-1/2" machine bolt with the
head to the outside of the shelter. Install the nut. See
diagram A.
3. Place an interior rafter assembly into the second set of
ground posts and secure the rafter to the ground posts as
previously described.
Inside of
Shelter
5/16" x 2-1/2"
Bolt
5/16"
Nut
Outside of
Shelter
Rafter
Ground
Post
A
Outside of
Shelter
Inside of