QUICK-START GUIDE
11
P
Lenum
S
hieLd
i
nStaLLation
Remove the liner from adhesive in four places on underside of shielding, and thread cables through cut slots before attaching to ceiling.
Page 1: ...BMA CT Beamforming Mic Array Ceiling Tile Quick Start Guide...
Page 2: ...FIRMWARE 8 TESTING THE ARRAYS 8 Volume Mute 8 Microphone Array LED Indicators 8 Microphone Array Orientation 9 MOUNTING THE ARRAYS 10 Plenum Shield with Seismic Cables 10 Plenum Shield Installation 1...
Page 3: ...ounding prong The wide blade or the third prong are provided for your safety If the provided plug does not fit into your outlet consult an electrician for replacement of the obsolete outlet 10 Protect...
Page 4: ...nce P Link and up to 6 arrays can be daisy chained in one regular P Link chain with a stack of two CP2 mixers Power to the arrays is supplied through a Power Over Ethernet PoE or P Link connection fro...
Page 5: ...r CP2 unit and up to 6 arrays per Regular P Link chain with 2 CP2 unit stack More CP2 units may be added to increase the number of arrays per site Quick Start Procedures These steps must be done in th...
Page 6: ...Link PoE port on the rack mounted CP2 unit or it can be connected directly to the ar ray s PoE In port When driving 2x10W speakers each array requires its own PoE injector When the PoE injector is co...
Page 7: ...2 3at specification should power three devices See also this app note http www clearone com sites default files PoE_and_CP2_P link_Periph eral_Products pdf The power source selection switch should be...
Page 8: ...one CP2 Unit P Link cables can vary in length up to 200 ft BMA CT requires its own PoE IEEE 802 3at compliant if speakers are driven P Link Power Audio Control CONVERGE Pro 2 PoE PoE PoE 2 x 10W speak...
Page 9: ...7 PoE PoE Connecting 3 BMA CT units and 3 P Link compatible devices to one CP2 unit P Link Power Audio Control CONVERGE Pro 2 Up to 200 ft P Link Up to 200 ft P Link Up to 200 ft P Link Up to 200 ft P...
Page 10: ...o the site using the CONVERGE Pro 2 CONSOLE software This software also provides the capability of configuring the beams enable disable and other characteristics available in Configuration mode Refer...
Page 11: ...m according to the beam selection needs for optimal coverage The diagrams below show the orientation of the LED indicators toward the head of the conference table with the resulting room coverage and...
Page 12: ...shield and seismic cables four slots of approximately 1 length should be cut diagonally in the plenum shielding to match the points of seismic cable attachment Otherwise skip this step and go to page...
Page 13: ...QUICK START GUIDE 11 Plenum Shield Installation Remove the liner from adhesive in four places on underside of shielding and thread cables through cut slots before attaching to ceiling...
Page 14: ...tional 1 8 safety seismic cables not included Four attachment points are recommended for stability If installing with the plenum shield feed cables thru slots cut in earlier step see Pg 10 Detailed in...
Page 15: ...0 3200 205 I PoE Power Supply Kit 910 3200 202 50 Ft RJ45 CAT6 Cable 910 3200 204 50 100 Ft RJ45 CAT6 Cable 910 3200 204 100 150 Ft RJ45 CAT6 Cable 910 3200 204 150 200 Ft RJ45 CAT6 Cable 910 3200 204...
Page 16: ...BMA CT 14 ISOMETRIC DIAGRAMS side views back view...
Page 17: ...1 975 7200 e mail sales clearone com TechSupport Tel 801 974 3760 e mail tech support clearone com CLEARONE LOCATIONS Supported CONVERGE Pro 2 Item Part No CONVERGE Pro 2 128 910 3200 001 CONVERGE Pro...