
BMA CT
10
MOUNTING THE ARRAYS
P
Lenum
S
hieLd
with
S
eiSmic
c
abLeS
If installing both the plenum shield and seismic cables, four slots of
approximately 1” length should be cut diagonally in the plenum shielding
to match the points of seismic cable attachment. Otherwise, skip this step
and go to page 11 for installation of plenum shield only or page 12 for
isntallation of seismic cables only.