
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
34
FieldSmart
®
Fiber Distribution Hub (FDH)
Installation Manual
_________________________________________________________
Manual 019703 REV B - March 2019
Optical Splitter Routing
Single Staging Plate
Two Staging Plates
144 Port FDH
If you intend to place two staging plates into the
cabinet at one time, replace the foam cradle with
the foam strips as shown by the install manual
provided with the splitter.
Install the splitter body into the top-most usable slot
in the splitter cage, to minimize fiber crossing, and
lock into place using the splitter retainer pin.
Route the splitter up and around the management
spools, around the top two radius fingers and to the
staging area. Clearfield recommends following the
routing diagram shown here.
Install the staging plate(s) into the staging area, as
shown in the pictures below and the install manual
provided with the splitter.
1.
2.
3.
4.
Staging Area
Splitter Cage
Proceed to connecting the feeder and distribution legs of the splitter as needed. Choose your desired port to connect
the splitter leg. Clearfield recommends you reference the routing diagram and designation card shown here and in the
cabinet. Each port will have one or two colors, corresponding to the radius spools that the splitter leg must route over
and under to properly take up the slack before connection.
Record the splitter leg number on the designation card in the correct cell.
5.
6.