Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
16
FieldShield & FieldShield Flexdrop
Installation Manual
_________________________________________________________
Manual 018956 REV A- July 2017
Step 9:
Stop inserting the 900um tubing keeping
the 6 inch mark approximately 1 inch from going
into the 3mm cable as seen in
(Figure 9)
.
Figure 9
Step 11:
Allow the glue to dry, and then trim the
excess Kevlar strength members behind the
heatshrink
(Figure 11).
Note:
The CraftSmart Splice-On Connector can
now be installed per standard instructions to the
900um furcated fiber.
Figure 10
Figure 11
Step 10:
Now apply a generous amount of super
glue to the 900um furcation tubing between the
FieldShield cable and the mark and then while
rotating, slide the furcation tubing up to the 6 inch
mark on the 900um tubing
(Figure 10)
.
Figure 8
Step 8:
Slide the 900um tubing over the 250um
fiber inserting the 900um tube into the FieldShield
3mm cable
(Figure 8)
.