background image

2

SCENIUS SPOT

Carefully read this instruction manual in its entirety and keep it safe for future reference. It is essential to know the
information and comply with the instructions given in this manual to ensure the fitting is installed, used and serviced
correctly and safely. CLAY PAKY S.p.A. disclaims all liability for damage to the fitting or to other property or persons
deriving from installation, use and maintenance that have not been carried out in conformity with this instruction
manual,  which  must  always  accompany  the  fitting.  CLAY  PAKY  S.p.A.  reserves  the  right  to  modify  the
characteristics stated in this instruction manual at any time and without prior notice.

• Installation
Make sure all parts for fixing the projector are in a good state of repair.
Make sure the point of anchorage is stable before positioning the projector.
The  safety  chain  must  be  properly  hooked  onto  the  fitting  and  secured  to  the  framework,  so  that,  if  the  primary
support system fails, the fitting falls as little as possible. 
If the safety chain gets used, it needs to be replaced with a genuine spare.

• MINIMUM DISTANCE OF ILLUMINATED OBJECTS
The  projector  needs  to  be  positioned  so  that  the  objects  hit  by  the  beam  of  light  are  at  least  5  metres
(16’5”) from the lens of the projector.

• Minimum distance from flammable materials
The projector must be positioned so that any flammable materials are at least 0.20 metres (8") from every point on
the surface of the fitting.

• Maximum ambient temperature
Do not operate the fixture if the ambient temperature (Ta) exceeds 40° C (104° F).

• IP20 protection rating
The fitting is protected against penetration by solid bodies of over 12mm (0.47”) in diameter (first digit 2), but not
against dripping water, rain, splashes or jets of water (second digit 0).

• Protection against electrical shock
Connection must be made to a power supply system fitted with efficient earthing (Class I appliance according to
standard EN 60598-1).
It is, moreover, recommended to protect the supply lines of the projectors from indirect contact and/or shorting to
earth by using appropriately sized residual current devices.

• Connection to mains supply
Connection to the electricity mains must be carried out by a qualified electrical installer.
Check that the mains frequency and voltage correspond to those for which the projector is designed as given on
the electrical data label.
This  label  also  gives  the  input  power  to  which  you  need  to  refer  to  evaluate  the  maximum  number  of  fittings  to
connect to the electricity line, in order to avoid overloading. 

• Temperature of the external surface
The maximum temperature that can be reached on the external surface of the fitting, in a thermally steady state, is
150°C (302°F).

• Maintenance
Before starting any maintenance work or cleaning the projector, cut off power from the mains supply.
After switching off, do not remove any parts of the fitting for at least 10 minutes. After this time the likelihood
of the lamp exploding is virtually nill. If it is necessary to replace the lamp, wait for another 20 minutes to avoid
getting burnt.
The fitting is designed to hold in any splinters produced by a lamp exploding. The lenses must be mounted and, if
visibly damaged, they have to be replaced with genuine spares.

• Lamp
The fitting mounts a high-pressure lamp that needs an external igniter. This igniter is fitted onto the apparatus.
- Carefully read the "operating instructions" provided by the lamp manufacturer.
- Immediately replace the lamp if damaged or deformed by heat.

SAFETY INFORMATION

IP20

5

LAMP

t

c

150°C

EN

Summary of Contents for scenius spot

Page 1: ...the rich Clay Paky range has been designed and made with total quality to ensure excellent performance and best meet your expectations and requirements INDEX Page Contents 2 Safety Information 5 Unpa...

Page 2: ...meter first digit 2 but not against dripping water rain splashes or jets of water second digit 0 Protection against electrical shock Connection must be made to a power supply system fitted with effici...

Page 3: ...the environment please dispose the battery at the end of its life according to the regulation in force Disposing This product is supplied in compliance with European Directive 2012 19 EU Waste Electr...

Page 4: ...sprachige Version des Handbuchs mit Sicherheitshinweisen fu r dieses Clay Paky Produkt unter folgendem Link herunterladen http www claypaky it en download Ref FIS00L Safety Information Scenius COMO OB...

Page 5: ...ATION 2 x 183102 805 LAM00D fitted into fixture 1 90 9 0 9 0 9 0 LOCKED UNLOCKED PAN Mechanism Lock and Release every 90 Fig 2 TILT Mechanism Lock and Release every 45 Fig 3 2 3 Packing contents Fig 1...

Page 6: ...d on the floor resting on special rubber feet on a truss or on the ceiling or wall WARNING with the exception of when the projector is positioned on the floor the safety cable must be fitted Cod 10504...

Page 7: ...y automatically returns to rest status It should be noted than when this condition occurs any possible value that has been modified but not yet confirmed with the Fkey will be cancelled CONTROL PANEL...

Page 8: ...isplay and thus access the settings Once the required operations have been carried out the display will switch off again after a wait time of 30 seconds USING THE MENU 1 Press F once Main Menu appears...

Page 9: ...0 255 OPTION Lamp DMX On Off Pan Tilt Invert Pan On Off Invert Tilt On Off Swap Pan Tilt On Off Encoder Pan Tilt On Off P T Homing mode Standard Sequenced Pan Home Def Pos 0 degree 90 degrees 180 degr...

Page 10: ...8 Ch Fw rev Hw rev 2 8 Ch Fw rev Hw rev 3 8 Ch Fw rev Hw rev Board Diagnostic 0 PT 3f Status Err 1 8 Ch Status Err 2 8 Ch Status Err 3 8 Ch Status Err DMX Monitor Channels Value Percentage Fans Monito...

Page 11: ...e TEST Pan Tilt n a Colour n a Beam n a Gobo n a All n a ADVANCED Access Code 1234 Upload Firmware Transfer Are you sure Yes No Setup Model Changing Are you sure Yes No Calibration Channels 000 255 Ro...

Page 12: ...on IP 2 x Art net on IP 10 x Art net Custom IP If the Control Protocol option is set on Disabled when an IP address IP2 IP10 or IP Custom is selected the projector immediately initializes the IP addr...

Page 13: ...ode It lets you set the initial Pan and Tilt Reset mode x Standard Pan Tilt are simultaneously reset x Sequenced Tilt is reset first followed by Pan Pan Home Def Pos It lets you assign the Pan channel...

Page 14: ...to 255bit lamp power 1200W DISPLAY It lets you activate ON display brightness reduction after about 30 seconds in idle status Select OFF to turn off or disable this option ANIMATION FIX GOBO It allow...

Page 15: ...f lamp partial working hours from the last reset to date Press OK to reset the partial counter A confirmation message appears on the display Are you sure Select YES to confirm reset LAMP STRIKES It le...

Page 16: ...T GOBO 1 INDEXING It lets you check whether the rotating gobo wheel 1 gobo indexing procedure should be run if indexed Indexing Active appears on the display otherwise Indexing required appears If nec...

Page 17: ...bort this operation SETUP MODEL It lets you change the projector model operation probably necessary after replacing the CPU during repairs A confirmation message Are you sure appears on the display Se...

Page 18: ...king and releasing Pan and Tilt movements Refer to the instructions in the UNPACKING AND PREPARATION section Opening the head covers Fig 10 Closing the head covers Fig 11 4 1 4 Turn 1 4 Turn 1 2 1 3 2...

Page 19: ...with any detergent liquid for cleaning glass to remove the dirt from the reflectors from the lenses and filters It is recommended that the projector undergoes an annual service by a qualified technic...

Page 20: ...20 SCENIUS SPOT 1 4 3 2 13 Cleaning of the filters Fig 13...

Page 21: ...the bulb with a cloth soaked in alcohol and dry it with a clean dry cloth IMPORTANT Make sure the lamp is inserted with the external contact A facing the elliptical reflector s slot CAUTION Fast lamp...

Page 22: ...INDEX 18 Replacing rotating gobos 32 8 mm max 26 mm image thickness 1 1 mm Fig 18 Before use custom gobos contact Clay Paky The original gobos have a special coating designed specifically to resist to...

Page 23: ...val Fig 19 This product contains a rechargeable lithium iron tetraphosphate battery To preserve the environment please dispose the battery at the end of its life according to the regulation in force 9...

Page 24: ...tic covers Working position Any Working Position Hanging system with fast lock omega clamps 1 4 turn on the base Effects section Very precise 0 100 dimmer CMY System Linear CTO Fast stop strobe effect...

Page 25: ...mains supply Lamp exhausted or defective Signal transmission cable faulty or disconnected Incorrect addressing Fault in the electronic circuits Lenses or reflector broken Dust or grease deposited Chec...

Page 26: ...TATION GOBO 1 ROTATION 12 FINE GOBO 1 ROTATION FINE GOBO 1 ROTATION 13 ROTATING GOBO 2 CHANGE ROTATING GOBO 2 CHANGE 14 GOBO 2 ROTATION GOBO 2 ROTATION 15 FINE GOBO 2 ROTATION FINE GOBO 2 ROTATION 16...

Page 27: ...able frequency from low 1 flash sec to high 12 flashes sec 104 107 Light ON 108 207 Pulsation at linearly variable speed from slow to fast 208 212 Light ON 213 225 Random Strobe at low frequency 226 2...

Page 28: ...op rotation 193 255 Continuous gobo rotation at linearly variable speed from slow 2 2 rph to fast 180 rpm 12 12 FINE GOBO 1 ROTATION 0 255 Fine Gobo Indexing 13 13 ROTATING GOBO 2 CHANGE 0 18 Empty po...

Page 29: ...to 450 range 105 127 Prism indexing 450 to 540 range 128 190 Continuous prism rotation at linearly variable speed from fast 80 rpm to slow 3 rph 191 192 Stop rotation 193 255 Continuous prism rotation...

Page 30: ...om Reset Zoom Reset sequence is activated passing through the unused levels range and staying in this range for 5 seconds 77 127 Pan Tilt Reset Pan Tilt Reset sequence passing through the unused level...

Page 31: ...109 33 110 111 112 34 113 114 35 115 116 117 36 118 119 37 120 121 122 38 123 124 125 39 126 127 40 128 BIT Seconds 129 130 41 131 132 42 133 134 135 43 136 137 44 138 139 140 45 141 142 46 143 144 1...

Page 32: ...CLAY PAKY S p A Via Pastrengo 3 b 24068 Seriate BG Italy Tel 39 035 654311 Fax 39 035 301876 www claypaky it IST00V 001 EN Rev 0 10 2015...

Reviews: