SECTION 5: 120V WIRING INSTRUCTIONS
1.) Loosen the screw securing the junction box cover and remove the cover.
2.) Pull the power supply wires through the hole in the cover.
3.) Pull out the 4 wires marked L, N, G, S from the junction box on the side of the
builder box.
4.) Connect the black L wire from the unit to the black L from the power supply.
5.) Connect the white N wire from the unit to the white N from power supply.
6.) Connect the green ground G wire from the unit to the ground from the power supply.
7.) Plug the S wire connector into the provided sign wire.
8.) Ensure that all connections are tight.
9.) Secure all the wiring with wire-caps, then insert into the junction box.
10.) Remount the junction box cover (see figure 8 & 9.)
E-8
Figure 8
Note: 36EB110-GRT & 36EB111-GRC will only run on 120 volt operation.
CONTROL
120 V
Configration
Min. 14AWG WIRE FROM
POWER SUPPLY (NOT SUPPLIED)
Min. 14AWG WIRE
FROM POWER SUPPLY
(NOT SUPPLIED)
www.pdfmailer.com
Print and send PDF files as Emails with any application, ad-sponsored and
free of charge
www.pdfmailer.com
PDFMAILER.COM