SAFETY

MAINTENANCE

The use of this jack is limited to the removal installation, and transportation in the lowest position ,of transmission 

and differentials

Avoid decentred placement of the gravity of the load , decentred placement of the load might cause overturning 

of or damage to the transmission jack.

ATTENTION !!! FIG. 6 - 7

• Do not use this type of jack to handle diffenrentials or gearshifts having dimensions greater than the jack base 

• Do not overload ! ! never lift the jack by the upper part. use the proper handles . 

• Assure that the load is not allowed to drop suddenty or swing during transporting. 

• This transmission jack is designed for use only onhard levelsurfaces capable of sustainig the load. use on ther 

than hard surfacis can result in the jack instability and possible loss of load. 

• Lower jib and load to the lowest possible position before transporting.

The safety valve is calibrated and 

sealed by the manufacturer: it is 

absolutely forbidden to tamper with 

this valve or charge its calibration. 

ATTENTION ! FAILURE TO HEED 

THESE WARNINGS may result in 

loss of the load ,damage to the jack 

and or failure resulting in personal 

injury or property damage . 

Open the packages while checking 

that the machine has not suffered any 

damages in transit and that all pieces 

in the packing list are present. 

The packing material is to be recycled or used again.

The hydraulic system is a closed system , which under normal circumstances, only requires a monthly oiling of the 

moving parts to be maintained. Activate the pump pedal and add oil slowly through the fi ller hole in case the 

hydraulic unit leaks oil and has been taken apart in order to replace wom seals by new ones ( see the spare part 

list ). ATTENTION ! NEVER USE BRAKE FLUID.

Quantityof oil: 1,6L

Warning : a surplus of oil might cause troubles. Usable oil: any hydraulic oil of gradation ISO 32 /22 ,

Grease the pins every 3 months. In case of oil leaking from the hydraulic system replace the seals.

Visual inspection shall be made before each use of the jack by checking for leaks ,damages and louse , missing or 

worn parts. Each jack shall be inspected immediately if it is believed to have been subjected to an abnormal load 

or shock.. It is RECOMMENDED that this inspection be made by supplier’s skilled personal. It is recommended 

that an annual inspection of the jack be made by a suppliers authorized specialist and that defective dangerous 

or other parts be replaced with original spare part supplied by the manufactured ( see spare part list )

Failure to heed these warnings may result in loss of the load , damage to the jack and or failure resulting in 

personal injury or property damage.

Every damaged very used or abnormally operating jack SHALL BE REMOVED FROM SERVICE.

Must be destructed the oil must be drained from the cylinder and recycled according to the country lawn in force. 

It is recommended that necessary repair be made by supplier’s authorized skilled personnel.

Summary of Contents for OH 0237

Page 1: ...clas equipements com VERIN DE FOSSE 2 ETAGES 1 5T 2 STAGE PIT JACK 1 5T OH 0237 ...

Page 2: ...4 rondelles 40 1 bouchon de purgeur d air 39 4 roulettes 42 1 support 1 2 chariots 41 1 cylindre Poids du vérin 62kg Assemblage Visser les roues 42 sur le chariot 41 Visser les 4 vis et les 4 rondelles 40 sur les 2 chariots 41 et la pompe 12 S ASSURER QUE LE VERIN SOIT BIEN PERPENDICULAIRE des deux côtés et fixer fermement Fig n 1 Insérer le support supérieur 1 dans la tige 4 Fig n 2 Changer le bo...

Page 3: ...ATTENTION le non respect de ces recommandations peut provoquer un abaissement de la charge des dommages sur le vérin et peuvent entraîner des blessures Ouvrir l emballage et vérifier que l appareil n a pas été endommagé pendant le transport et que toutes les pièces citées ci dessus sont présentes L emballage carton peut être recyclé ou réutilisé à nouveau Quantité d huile 1 6L Attention un surplus...

Page 4: ... 4 screws 4 washers 40 1 air relief plug 39 4 wheels 42 support 1 2 trolleys 41 complete cylinder Weight of jack 62kg Screw the wheels 42 on the trolley 41 Screw in the 4 screws and 4 washers 40 in the 2 trolleys 41 and pump 12 MAKE SURE IT IS PERPENDICULAR on both sides and FASTEN it firmly FIG 1 I insert the upper support 1 in the stem 4 FIG NR 2 Charge the plug 39 with the bored plug FIG NR 3 S...

Page 5: ...sed again The hydraulic system is a closed system which under normal circumstances only requires a monthly oiling of the moving parts to be maintained Activate the pump pedal and add oil slowly through the filler hole in case the hydraulic unit leaks oil and has been taken apart in order to replace wom seals by new ones see the spare part list ATTENTION NEVER USE BRAKE FLUID Quantityof oil 1 6L Wa...

Page 6: ...NOTES ...

Page 7: ...NOTES ...

Page 8: ...ter le technicien de votre distributeur agréé If you need components or parts please contact the reseller In case of problems please contact your authorized technician CLAS Equipements ZA de la CROUZA 73800 CHIGNIN FRANCE Tél 33 0 4 79 72 62 22 Fax 33 0 4 79 72 52 86 VERIN DE FOSSE 2 ETAGES 1 5T 2 STAGE PIT JACK 1 5T OH 0237 ...

Reviews: