background image

 OH  0237 

 2 STAGE PIT JACK 1.5T 

DESCRIPTION

ASSEMBLING

These instructions are an essential part of the transmission jack and must always follow it even in case of sale. 

The owner and or the operator of the jack shall understand the product operating instructions and warnings before 

operating the jack.

The jack maker is not liable for damages brought about to people or things due to unfi t or unfl awed use of the jack.

PACKING

- 4 4 washers (40 ) 

- 1 air relief plug (39 )

- 4 wheels ( 42 )

- support (1 )

- 2 trolleys (41 )

- complete cylinder

Weight of jack: 62kg

Screw the wheels (42) on the trolley (41)

Screw in the 4 screws and 4 washers 

(40) in the 2 trolleys (41) and pump (12)

MAKE SURE IT IS PERPENDICULAR on 

both sides and FASTEN it fi rmly ( FIG.1 )

I insert the upper support (1) in the stem 

(4) ( FIG. NR.2 )

Charge the plug (39) with the bored 

plug (FIG. NR. 3)

START-UP 

After carrying out the abovementioned operations the lift is ready 

for use ; turn the release valve (36) and just operate the pedal (30) 

to lift and to rotate the load (36) slowly counter- clockwise to lower. 

(FIG. NR.4 - FIG.NR.5) 

Summary of Contents for OH 0237

Page 1: ...clas equipements com VERIN DE FOSSE 2 ETAGES 1 5T 2 STAGE PIT JACK 1 5T OH 0237 ...

Page 2: ...4 rondelles 40 1 bouchon de purgeur d air 39 4 roulettes 42 1 support 1 2 chariots 41 1 cylindre Poids du vérin 62kg Assemblage Visser les roues 42 sur le chariot 41 Visser les 4 vis et les 4 rondelles 40 sur les 2 chariots 41 et la pompe 12 S ASSURER QUE LE VERIN SOIT BIEN PERPENDICULAIRE des deux côtés et fixer fermement Fig n 1 Insérer le support supérieur 1 dans la tige 4 Fig n 2 Changer le bo...

Page 3: ...ATTENTION le non respect de ces recommandations peut provoquer un abaissement de la charge des dommages sur le vérin et peuvent entraîner des blessures Ouvrir l emballage et vérifier que l appareil n a pas été endommagé pendant le transport et que toutes les pièces citées ci dessus sont présentes L emballage carton peut être recyclé ou réutilisé à nouveau Quantité d huile 1 6L Attention un surplus...

Page 4: ... 4 screws 4 washers 40 1 air relief plug 39 4 wheels 42 support 1 2 trolleys 41 complete cylinder Weight of jack 62kg Screw the wheels 42 on the trolley 41 Screw in the 4 screws and 4 washers 40 in the 2 trolleys 41 and pump 12 MAKE SURE IT IS PERPENDICULAR on both sides and FASTEN it firmly FIG 1 I insert the upper support 1 in the stem 4 FIG NR 2 Charge the plug 39 with the bored plug FIG NR 3 S...

Page 5: ...sed again The hydraulic system is a closed system which under normal circumstances only requires a monthly oiling of the moving parts to be maintained Activate the pump pedal and add oil slowly through the filler hole in case the hydraulic unit leaks oil and has been taken apart in order to replace wom seals by new ones see the spare part list ATTENTION NEVER USE BRAKE FLUID Quantityof oil 1 6L Wa...

Page 6: ...NOTES ...

Page 7: ...NOTES ...

Page 8: ...ter le technicien de votre distributeur agréé If you need components or parts please contact the reseller In case of problems please contact your authorized technician CLAS Equipements ZA de la CROUZA 73800 CHIGNIN FRANCE Tél 33 0 4 79 72 62 22 Fax 33 0 4 79 72 52 86 VERIN DE FOSSE 2 ETAGES 1 5T 2 STAGE PIT JACK 1 5T OH 0237 ...

Reviews: