o
NOTE: 1.
Letters in brackets refer to Fig.1
2.
Unless otherwise stated, all nuts, bolts, washers and fixings are supplied.
IMPORTANT
For maximum safety and to ensure the adjustments are carried out correctly,
assistance should be employed during the assembly operation.
6
ASSEMBLY
1. The Stand
1.1 Attach the axle assembly (P) to the frame
(R), using two M8 x 60 bolts, together with
nut, spring and flat washers, ( see Fig.2).
NOTE:
A number of holes are provided to mount the
Axle assembly. Select those you feel will provide
a comfortable working height ....bearing in mind
the minimum height required to allow a
wheelbarrow to be placed beneath the drum.
1.2 Turn the frame over and attach the Leg (S),
in the same manner, as shown in Fig.2.
1.3 Slide a wheel on to each stub axle, followed
by a large flat washer and locate them using
the split pins provided.
Tighten all nuts securely before righting the
stand.
Fig.2
Fig.3
2. The Bottom Drum
2.1 Carefully, and with assistance, lower the
bottom drum assembly (D), on to the stand
as shown in Fig.. 3, so that the bearing blocks
(X), slot into the channels provided by the
side supports.
The drive shaft end, i.e. that end where the
pinion drives the drum, should be at the AXLE
end of the Frame.
2.2 Line up the holes in the side support with
those in the bearing block and enter an M8
x 60 bolt with flat washer and secure using a
nut and spring washer.
Summary of Contents for 3400820
Page 14: ...o PARTS DIAGRAM 14 14...
Page 16: ...o...