WARNING  - do not touch or hold the EUT during testing. Ensure the EUT 
cannot move when under test.     

Testing Metal Case (Class 1) Products 

• 

Before connecting to the Tester a visual inspection must be carried out 
to ensure the EUT has no loose cables on plugs or cable entries, and to 
verify the condition of the supply cord. 

• 

Connect the EUT to the appropriate test output socket. 

• 

Ensure the EUT is switched on and properly supported.  

• 

Connect the ground clip to a metal part on the body of EUT. 

• 

WARNING  During LEAKAGE tests the product will be powered at line 
voltage and will operate.  Make sure the ground clip is not connected to 
moving parts. 

• 

Press and hold the TEST button to begin test sequence.  If the TEST 
button is released at any time the sequence will be aborted.   

• 

If any test fails all outputs are switched off and the FAIL indicator will 
flash for 3 seconds accompanied by the buzzer sounding. 

• 

As each test is performed the indicator will flash.  When a test is 
complete the next test in the sequence will start automatically. 

• 

After the SHORT to LINE test has finished the LEAKAGE test will not 
start until the TEST button has been released and the RUN/LEAKAGE 
button has been pushed. 

• 

Press and hold the RUN/LEAKAGE button to start the LEAKAGE test. If 
the RUN/LEAKAGE button is released at any time the test sequence will 
abort. 

• 

WARNING  During LEAKAGE tests hazardous voltages may be 
present.  Do not touch the EUT during LEAKAGE tests. 

• 

When all tests are successfully completed the PASS indicator will flash 
for 3 seconds. 

Testing Double Insulated (Class 2) Products 

• 

Before connecting to the Tester a visual inspection must be made to 
ensure the EUT has no loose cables on plugs or entries, and to verify 
the condition of the supply cord. 

• 

Connect the EUT to the appropriate test output socket. 

• 

Ensure the EUT is switched on and properly supported. 

• 

Connect the ground clip to body of EUT. 

Summary of Contents for Safe Check 5s

Page 1: ...Rental Industry Safety Tester Safe Check 5s Feb 2006 2006 Clare Instruments Inc Issue 2 0 Firmware Version 1 2a...

Page 2: ......

Page 3: ...rough negligent use or handling will void your warranty Copyright 2005 All rights reserved Nothing from this edition may be copied for reproduction or made public in any form or manner either electron...

Page 4: ...Standard Accessories 5 Optional Accessories 5 SPECIFICATIONS 6 Input Rating 6 Ground Bond Test 6 Short to Case Test 6 Short to Line Test 6 Leakage Test 6 PURPOSE OF THE TESTS 7 Ground Bond Test 7 Sho...

Page 5: ...TESTER 9 Testing Metal Case Class 1 Products 9 Testing Double Insulated Class 2 Products 9 Testing Extension Cords 10 RUN LEAKAGE Test Self Test Facility 10 REPAIR AND CALIBRATION 11 MAINTAINING THE...

Page 6: ......

Page 7: ...test results using appropriate standards the product is in conformity with Electromagnetic Compatibility Directive 89 336 EEC and Low Voltage Directive 73 23 EEC Standards used EN 61010 1 2001 Safety...

Page 8: ...training in Electrical Safety Testing Courses can be arranged at Clare or at the customer location 4 Clare Instruments reserve the right to update the software in any instruments returned to them for...

Page 9: ...actions that pose hazard s to the user A caution will identify the conditions and actions that may damage the Tester Symbols used within this manual and on the Tester are shown below Risk of electric...

Page 10: ...number of electrical tests which involve supply voltages and high currents Never touch the Product being tested or the test leads whilst a test is in progress Never remove the cover and touch any int...

Page 11: ...e following innovative features Automatically checks supply power outlet for faults Accurate Ground Bond Short and Leakage Current measurements Simple PASS FAIL indication Automatic selection of corre...

Page 12: ...Nominal Test Current 7A Typical Fail Level 500m Short to Case Test Test Voltage 6 Vac Nominal Test Current 20 Amps Typical Fail Level 150k Short to Line Test Test Voltage 6 Vac Nominal Test Current 1...

Page 13: ...to prevent damage due to overheating Short to Case Test A low voltage test to ensure there is no short present between the line conductor and the case Short to Line Test A low voltage test to ensure...

Page 14: ...there is a fault Supply Power Outlet faults If a fault is detected indicated by the Green PASS and Red FAIL indicators switch the tester off immediately and correct the fault Seek assistance if you a...

Page 15: ...L indicator will flash for 3 seconds accompanied by the buzzer sounding As each test is performed the indicator will flash When a test is complete the next test in the sequence will start automaticall...

Page 16: ...dition of the supply cord Connect the socket end of the EUT to the Tester output plug male and the plug end of the EUT to the appropriate test socket output Press and hold the TEST button to begin the...

Page 17: ...ill abort The LEAKAGE test should fail Note the Leakage Self Test button must be pressed for the full duration of the LEAKAGE test If the LEAKAGE test does not fail contact Clare Instruments Inc for s...

Page 18: ...lity instrument However care should always be taken when using transporting and storing this type of equipment Failure to treat the product with care will reduce both the life of the instrument and it...

Page 19: ...Your Safety Tester 13 Notes...

Page 20: ......

Reviews: