5
Revised 08/09
V SERIES
Cartridge Dust Collector
DOWNTIME CLEANING OPERATION
1. Turn the CLEAN switch to the ON position. The PWR
light will be ON.
2. When the CLEAN CONTROL contacts (#13 and 14)
are shorted, the CLEAN light will be ON.
3. When the CLEAN CONTROL contacts open, the
CLEAN light will flash for the duration of the cleaning
cycle.
4. After the 60-second blower coast down delay, the
valve output (V and N) will turn on for the selected
length of time (100 or 150mS).
5. If more than one pulse is selected (2, 4 or 6), there
will be a 10 or 30 second delay as selected between
the pulses.
6. When the cleaning cycle is complete, the CLEAN
light will turn OFF and the control board will wait for
the CLEAN CONTROL contacts to close again.
If at any time during the cleaning cycle the CLEAN
CONTROL contacts close, the cleaning cycle will be
aborted, the CLEAN light will stop flashing, and the unit
will wait for the CLEAN CONTROL contacts to open.
The unit will NOT remember how many pulses were
previously performed; and the cleaning cycle will start
again from the beginning.The position of the four
"white" switches on S1 determine the number of pulses,
the length of the pulse and the delay between pulses.
The position of the switches are read when the CLEAN
CONTROL contacts open, and will not affect the
cleaning cycle if changed during a cleaning cycle. (See
Figure 5 for Cleaning Control Switch Settings)
Upon motor/blower shutdown, downtime cleaning will
only be performed if the CLEAN SWITCH is in the ON
position before the motor/blower is turned OFF. During
downtime cleaning, the CLEAN light will flash for the
duration of the cycles selected.
5. OPERATION
5.1 START-UP
1. Position unit in desired location.
NOTE:
Do not attempt to move the portable unit by
pulling on the swing arm or hood. Use the full-
width, bar-type handle on the back of the unit to
push the V Series into the desired location. After
the unit is situated, use the locks on the rear
wheel casters to secure the unit.
2. Plug the unit into a properly grounded electrical
receptacle.
A separate motor starter auxiliary isolated dry contact
must be supplied with the motor/blower starter for all 3-
phase models and wired to terminals #13 and #14 of
the pulse control board.
TIMER BOARD SPECIFICATIONS
Power Requirement: 100-132VAC, 1 amp, 50/60Hz.
Operating Temperature: -40ºF to 140ºF (-40ºC to 60ºC),
Output: 1 solid-state switch at 1 amp max.
Required Input: Motor starter or switch isolated
normally open contact.
CLEANING CYCLE ADJUSTMENTS/TIMES
(See Figure 5 for Cleaning Control Switch Settings)
Blower coast down delay: 60 seconds, non-adjustable
Number of downtime pulses performed upon blower
shutdown: 1, 2, 4 or 6
Length of time between pulses: 10 or 30 seconds
Length of time output to valve is on: 100 or 150
milliseconds.
Figure 5. Cleaning Control Switch Settings
I M P O RTA N T
Information for units with 3-phase power