Nitrogen Generators
Nitro35 Nitro70
19
6.2.
First start-up
6.2.1.
Configuration
The brand new generator is set and ready to start production. The user can ac-
cess to the parameters set up menu (i.e. language, start-up mode, etc. ).
Please see par. “Parameters setting”.
6.2.2.
Working sequence
1.
Verify that all connection are made according to what described in chapter 4
(INSTALLATION).
2.
Verify compressed air pressure.
3.
Shut the Nitrogen line down, at the outlet of the generator.
4.
Switch the generator on, switching on the POWER key (see par. 6.3 “Switching
on the generator).
5.
Start Nitrogen production pushing the START-STOP key (see par. 6.4. Nitrogen
production).
6.
Wait till the generator reaches the stand-by condition. In this condition, the
generator stops the normal production cycle and the display shows the
message STAND-BY.
7.
From this moment on, Nitrogen is available in the line, opening the valve
shutted in point 2.
8.
Flux in the enviroment for at least 30 minutes in order to clean the pipeline and
the reservoir.
6.3.
Switching on the generator
To switch on the generator, please turn the POWER switch on the front panel
“ON”.
The display lights up and the depressurization cycle starts automatically after
few seconds. In this phase, that last max. 30 seconds, the following message is
displayed:
PLEASE WAIT
DEPRESSURIZATION IN PROGRESS
Once depressurization is completed, the following message appears:
GENERATOR READY
In this status, the generator is ready to accept the production command (see
par. 6.4.) or the switch off command (see par. 6.6.).