M 3..7
22
EN
Installation
ing width of ≥ 3 mm per phase must be provided at the installation end.
b. Connect the connecting pipe via a junction box to the mains, as shown in the circuit dia-
gram.
Alternatively:
4. Connection to a permanently installed cable:
a. Note that according to VDE 0700, an all-pole disconnecting device with a contact open-
ing width of ≥ 3 mm per phase should be provided at the installation end.
b. The cross-section of the cable must meet the requirements of the minimal cross-section,
as mentioned in chapter “Technical specifications“. The maximum applicable cross-sec-
tion is 6 mm
2
.
c. Open the cover.
d. Dismount the pre-installed connection cable.
e. Route the permanently installed cable through the grommet and connect it as shown in
the circuit diagram. Make sure that the grommet fits tightly around the cable to ensure
optimal protection against water.
f. Refit the cover on the appliance.
The earth conductor must be connected!
Fig. 6:
“Circuit diagram”
M 3, M 4 (230 V)
M 6 (230 V)
M 7 (400 V)
Summary of Contents for M 3
Page 131: ...131 CLAGE BG 2 1 3 1 1 4...
Page 132: ...132 M3 7 BG 3 5 4 4kW CSP3 5 7 6 5kW CSP6 G3 8 550 850 520 553 3 2 2 1...
Page 133: ...133 CLAGE BG 1 2 3 4 4 5 CLAGE 2 2 2 3...
Page 134: ...134 M3 7 BG a d a b c e a b c d e 5 6 7...
Page 135: ...135 CLAGE BG 1 2 3 4 a b 4 a 3 b 4 a 3 b 6 2 c d e f 2 4...
Page 136: ...136 M3 7 BG M3 M4 230 V M6 230 V M7 400 V 6 1 2 M22 24 7 3 4 5 6 www clage com 2 5...
Page 138: ...138 M3 7 BG 10 10 25 30 40 20 10 0 0 0 1 0 2 0 3 0 4 0 5 0 K 11 3 2...
Page 139: ...139 CLAGE BG 1 2 3 4 5 6 7 12 1 2 3 3 3 3 4 3 5...
Page 140: ...140 M3 7 BG 4 4 1 M6...
Page 142: ...142 M3 7 BG 1 2 100 1 2 3 4 5 15 6 5 5 1 5 2...