
77
CHECKING AND SETTING THE VALVE TIMING
Engines : 8HY - 8HV
B1BP2N0C
Tools.
[1] Engine flywheel peg Ø 12 mm
: (-).0194-C.
[2] Camshaft pulley peg Ø 8 mm
: (-).0194-B.
[3] Crankshaft pulley peg Ø 5 mm
: (-).0194-A.
Preliminary operations.
Remove:
- The front RH wheel.
- The front RH splash-shield.
- The accessories belt (see corresponding operation).
Uncouple:
- The supply unions (1).
- The air/air heat exchanger inlet/outlet pipes (3).
- The exhaust line (at the flexible pipe).
Disconnect the connector (2).
Support the engine by means of a roller jack equipped with a chock.
Remove the engine supports (4) and (5).
ENGINE
Summary of Contents for C3 2002
Page 12: ...10 GENERAL GENERAL SPECIFICATION DIMENSIONS E1AP09KD...
Page 135: ...133 INJECTION FEATURES OF SIEMENS HDI DIRECT INJECTION SYSTEM Summary B1HP1JFP...
Page 139: ...137 INJECTION FEATURES OF DELPHI C6 HDI DIRECT INJECTION SYSTEM Summary B1HP1JRP...
Page 172: ...170 CLUTCH GEARBOX DRIVESHAFTS AL4 GEARBOX CONTROLS Engine KFV B2CP3H7D...
Page 199: ...BRAKE SPECIFICATIONS Braking circuit with ABS REF drum brakes at the rear B3FP162D BRAKE 197...
Page 200: ...BRAKE 198 BRAKE SPECIFICATIONS Braking circuit with ABS REF disc brakes at the rear B3FP163D...