
Optional: Keep the shipping container in case the fabric interconnect requires shipping in the future.
Tip
The interconnect is thoroughly inspected before shipment. If any damage occurred during transportation or
any items are missing, contact your customer service representative immediately.
Note
Procedure
Step 1
Compare the shipment to the equipment list provided by your customer service representative and verify that
you have received all items, including the following:
• Grounding lug kit
• Rack-mount kit
• ESD wrist strap
• Cables with connectors
• Any optional items ordered
Step 2
Check for damage and report any discrepancies or damage to your customer service representative. Have the
following information ready:
• Invoice number of shipper (see packing slip)
• Model and serial number of the damaged unit
• Description of damage
• Effect of damage on the installation
Required Equipment
Before beginning the installation, ensure that the following items are ready:
• Number 1 and number 2 Phillips screwdrivers with torque-measuring capability
• 3/16-inch flat-blade screwdriver
• Tape measure and level
• ESD wrist strap or other grounding device
• Antistatic mat or antistatic foam
The following additional items (not found in the accessory kit) are required to ground the chassis:
Cisco UCS 6400 Series Fabric Interconnect Hardware Installation Guide
17
Installing the Cisco UCS Fabric Interconnect
Required Equipment