Date
Time
Verified By
Planning Activity
Task No.
Environmental
evaluation:
• Ambient
temperature
• Humidity
• Altitude
• Atmospheric
contamination
• Air flow
2
Power evaluation:
• Input power
type
• Power
receptacles
• Receptacle
proximity to
the equipment
• Dedicated
circuit for
power supply
• Dedicated
(separate)
circuits for
redundant
power supplies
• UPS for power
failures
3
Grounding
evaluation:
• Circuit breaker
size
• CO ground
(AC- powered
systems)
4
Cisco UCS 6300 Series Fabric Interconnect Hardware Installation Guide
72
Site Planning and Maintenance Records
Site Planning and Maintenance Records