C H A P T E R
2-1
VPN Acceleration Module 2+ (VAM2+) Installation and Configuration Guide
OL-5979-03
2
Preparing for Installation
This chapter describes the general equipment, safety, and site preparation requirements for installing the
VPN Acceleration Module 2+ (SA-VAM2+). This chapter includes the following sections:
•
Required Tools and Equipment, page 2-1
•
Hardware and Software Requirements, page 2-1
•
Restrictions, page 2-3
•
Safety Guidelines, page 2-3
•
Compliance with U.S. Export Laws and Regulations Regarding Encryption, page 2-5
Required Tools and Equipment
You need the following tools and parts to install a SA-VAM2+. If you need additional equipment, contact
a service representative for ordering information.
•
SA-VAM2+
•
Number 2 Phillips screwdriver
•
Your own electrostatic discharge (ESD)-prevention equipment or the disposable grounding wrist
strap included with all upgrade kits, field-replaceable units (FRUs), and spares
•
Antistatic mat
•
Antistatic container
•
Grounding wrist strap
•
(Optional) Port Adapter Jacket Card for installation of a port adapter in the I/O controller slot of
Cisco 7200VXR routers with an NPE-G1 or NPE-G2 processor
Hardware and Software Requirements
This section describes the minimum software and hardware requirements for the SA-VAM2+:
•
Software Requirements, page 2-2
•
Hardware Requirements, page 2-2
•
Restrictions, page 2-3