Always use the supplied ESD wristband when working with a powered ONS 15454 M6. For detailed instructions
on how to wear the ESD wristband, see the
Electrostatic Discharge and Grounding Guide for Cisco CPT and
.
Caution
Procedure
Step 1
Disconnect the power source and remove the power connections from the B-side power module (installed in
slot B).
Step 2
Unscrew the holding screw that secures the 15454-M6-AC2 power module.
Step 3
Pull the 15454-M6-AC2 power module clear from the ONS 15454 M6 chassis.
Step 4
Install the 15454-M6-AC power module as described in the
DLP-G569 Install the AC Power Module in the
ONS 15454 M6 Shelf, on page 85
Step 5
Install power on the 15454-M6-AC power module as described in the
NTP-G256 Install Power and Ground
to the ONS 15454 M6 Shelf , on page 100
While replacing the power modules, do not provision or install any line cards when the ONS 15454
M6 chassis is in the mixed power mode (with both 15454-M6-AC and 15454-M6-AC2 power
modules installed). Card provisioning and installation must be done only after both the slots have
the same type of power modules.
Note
Step 6
Perform steps 1 to 5 for the other power module (installed in slot A).
Step 7
Return to your originating procedure (NTP).
DLP-G570 Install the DC Power Module in the ONS 15454 M6 Shelf
This procedure installs the 15454-M6-DC, 15454-M6-DC20, or 15454-M6-DC40
DC power module in the ONS 15454 M6 system.
Purpose
#2 Phillips Dynamometric screwdriver
Tools/Equipment
•
NTP-G252 Install the ONS 15454 M6 Shelf , on page 24
.
•
NTP-G259 Open and Remove the Standard Door of the ONS 15454 M6
Shelf , on page 57
• Connect the chassis to the office ground. For detailed instructions on how
to ground the chassis, see the
Electrostatic Discharge and Grounding Guide
for Cisco CPT and Cisco ONS Platforms
Prerequisite Procedures
Required
Required/As Needed
Onsite
Onsite/Remote
None
Security Level
Installing the ONS 15454 M6 Shelf
90
Installing the ONS 15454 M6 Shelf
DLP-G570 Install the DC Power Module in the ONS 15454 M6 Shelf