3-55
Cisco MGX 8950 Hardware Installation Guide
Release 3, Part Number 78-14147-02 Rev. A0, November 2002
Chapter 3 Installing a Cisco MGX 8950
Installation Procedures
Figure 3-39 Ethernet Connection to the LAN 1 Port
Note
The LAN 2 port in
is not enabled.
For further information about server management and configuration set up, refer to the appropriate
software configuration guide for your switch and your release.
Verify EMI Compliance
For the switch to be EMI compliant, either the optional front door must be installed on the switch or
blank faceplates must be installed to cover any empty slots.
At this time, verify that your switch either has a front door installed and closed or that each empty slot
has a bank faceplate installed to cover it.
PXM
UI-S3
C
P
M
P
A
L
1
N
L
2
N
A
L
A
A
R
M
E
X
T
C
L
K
1
E
X
T
C
L
K
2
44372
Workstation
Hub or router
Ethernet cable
PXM-UI-S3
back card