Installing the Router 3-15
Connecting to a Network
Step 2
Connect the Token Ring port (DB-9) to a MAU, as shown in Figure 3-12. To
ensure agency compliance with electromagnetic emissions requirements (EMI),
ensure that the lobe cable is shielded.
Figure 3-12
Connecting a MAU
H6568
TOKEN RING
Standard IEEE
802.5 connector
Token Ring
port (DB-9)
Token Ring
lobe cable
(not provided)
MAU
Router
Summary of Contents for CPA2501
Page 4: ...xviii Router Installation and Configuration Guide Conventions ...
Page 14: ...1 10 Router Installation and Configuration Guide Ordering Documentation ...
Page 32: ...2 18 Router Installation and Configuration Guide Where to Go Next ...
Page 78: ...4 24 Router Installation and Configuration Guide Getting More Information ...
Page 84: ...A 6 Router Installation and Configuration Guide Reading the LEDs ...
Page 122: ...C 24 Router Installation and Configuration Guide ISDN BRI Port and Cable Pinouts ...
Page 138: ...2 16 Cisco 2500 Series Multiport Serial Router User Guide Inspecting the System ...