19
Cisco CompactFlash Adapter for Bootflash Upgrade Installation Note
78-17277-05
Installing the SP Bootflash Memory Upgrade Kit
Figure 8
Clearing the EMI Gasket in a Horizontal Slot Chassis
Vertical slots
a.
Position the supervisor engine in the slot. (See
Figure 9
.) Make sure that you align the sides of the
module carrier with the slot guides on the top and bottom of the slot.
b.
Carefully slide the supervisor engine into the slot until the EMI gasket along the right edge of the
module makes contact with the module in the slot adjacent to it and both ejector levers have closed
to approximately 45 degrees with respect to the module faceplate. (See
Figure 10
.)
1
2
3
FAN
STATUS
4
5
6
1mm
1
2
4
3
5
5
4
6
6
Gap between the module
EMI gasket and the
module above it
Press down
Press down
91528