Power Supply Modules (Applies to the Catalyst 2960-XR Switches)
19
Management Options
20
Network Configurations
21
C H A P T E R 2
Switch Installation
23
Safety Warnings
23
Box Contents
26
Tools and Equipment
26
Installation Guidelines
26
Verifying Switch Operation
27
Planning and Installing a Switch Stack (Optional)
28
Stack Guidelines
28
Installing the FlexStack-Plus Module
29
Stack Cabling
31
Stack Bandwidth and Partitioning Examples
32
Power-On Sequence for Switch Stacks
33
Installing the Switch
33
Rack-Mounting
33
Attaching the Rack-Mount Brackets for the Catalyst 2960-X Switches
35
Attaching the Rack-Mount Brackets for the Catalyst 2960-XR Switches
36
Mounting in a Rack
37
Wall-Mounting
38
Attaching the Brackets for Wall-Mounting
38
Attaching the RPS Connector Cover
39
Mounting on a Wall
40
Installing the Switch on a Table or Shelf
41
After Switch Installation
41
Connecting the FlexStack Cables (Optional)
41
Removing a FlexStack Cable
42
Installing the Power Cord Retainer (Optional)
43
Installing SFP and SFP+ Modules
45
Installing an SFP or SFP+ Module
46
Removing an SFP or SFP+ Module
47
Connecting to SFP and SFP+ Modules
47
Connecting to Fiber-Optic SFP and SFP+ Modules
48
Catalyst 2960-X and 2960-XR Switch Hardware Installation Guide
iv
OL-28309-02
Contents