34
SET0403030
4.3.3 Installing option (New SB)
Install according to the following procedures.
ANNT)
- The installation location and quantity have to indicate by the system administrator.
- Confirm connecting position of power cable of the Base Unit beforehand.
(1) Prepare the new SB.
(2) Follow the instructions of the system administrator to install memories.
See Appendix F.8 “
(3) Next procedure follows to chapter 2 “
”.
SET0404000
4.4 Verifying operation
Confirm the installed memory according to the following procedures.
(1) Start Video Redirection.
See Appendix E.3.1 “
(2) Set “BIOS Setup” at “Boot Device Selector”.
See Appendix E.4 “
(3) Turn on the system power.
See Appendix E.5.1 “
→ Wait for a few minutes until "Figure 4.4
-1" is displayed. (Max. 10 minutes)
Summary of Contents for C880 M5
Page 94: ...94 Appendix ...
Page 97: ...97 Figure B 1 Distribution panel breaker characteristics ...
Page 102: ...102 Figure D 3 3 When 1 AC Source Figure D 3 4 When 1 AC Source ...
Page 105: ...105 Figure E 2 1 2 ...
Page 108: ...108 Figure E 3 1 2 ...
Page 112: ...112 Figure E 5 1 2 ...
Page 119: ...119 Figure E 10 2 ...
Page 135: ...135 Figure F 7 1 5 ...
Page 137: ...137 Figure F 8 1 2 Figure F 8 1 3 ...
Page 142: ...142 Figure F 9 3 3 Figure F 9 3 4 ...
Page 144: ...144 Figure F 10 1 3 ...
Page 152: ...152 Figure F 13 1 1 Module MC 0JXEL1 Figure F 13 1 2 Module MC 0JCEK1 ...
Page 156: ...156 APP0614000 F 14 Installing M 2 Flash Device See Figure F 14 Figure F 14 ...
Page 163: ...163 APP0617000 F 17 Installing TPM See Figure F 17 Figure F 17 ...
Page 165: ...165 Figure G 1 2 ...
Page 171: ...171 APP0902000 I 2 Fibre Channel card Figure I 2 ...
Page 172: ...172 APP0903000 I 3 SAS card SAS RAID controller card Figure I 3 ...
Page 173: ...173 APP0904000 I 4 CNA card Figure I 4 ...
Page 174: ...174 APP0905000 I 5 Infiniband HCA card Figure I 5 ...