Replacing Components
Operation Panel
Cisco C880 M4 Storage Subsystem Operating Manual
for Server with E7-8800 v3 CPU
49
Remove the ribbon cable connecting the operation panel.
Mont the new operation panel in reverse order.
Install the disks as recorded when you removed them.
i